Difference between revisions of "Micro Hydro Power (MHP) Troubleshooting Poster for Operators in Indonesia (GIZ Indonesia, September 2012)"
***** (***** | *****) |
***** (***** | *****) |
||
Line 3: | Line 3: | ||
GIZ Indonesia, as part of EnDev Indonesia, has been supporting the sustainability of '''micro-hydro power (MHP) '''and '''photo-voltaic village power (PV-VP; solar mini-grid) '''installations in Indonesia since 2006 and 2013 respectively. As part of these efforts, capacity building initiatives for 'Village Management Team (VMT) are conducted, along with the distribution of a range of information materials (e.g. operator log book, treasurer cash book, etc). One such information material is an A0 full colour poster depicting, in the form of a flowchart, the basic operational troubleshooting steps that an MHP and PV-VP operator can perform. | GIZ Indonesia, as part of EnDev Indonesia, has been supporting the sustainability of '''micro-hydro power (MHP) '''and '''photo-voltaic village power (PV-VP; solar mini-grid) '''installations in Indonesia since 2006 and 2013 respectively. As part of these efforts, capacity building initiatives for 'Village Management Team (VMT) are conducted, along with the distribution of a range of information materials (e.g. operator log book, treasurer cash book, etc). One such information material is an A0 full colour poster depicting, in the form of a flowchart, the basic operational troubleshooting steps that an MHP and PV-VP operator can perform. | ||
− | |||
− | |||
The poster was designed in MSPowerPoint, in order to facilitate easy revision and translation. Current version is available in English and Bahasa Indonesia and can be dowloaded below. | The poster was designed in MSPowerPoint, in order to facilitate easy revision and translation. Current version is available in English and Bahasa Indonesia and can be dowloaded below. | ||
− | <br/> | + | In addition, a poster of '''catchment area managment '''is also provided to operators, as means to sensitise rural communities about the link between an MHP's operational performance and the environment.<br/> |
[[File:130730 MHP Troubleshooting Poster (GIZ EnDev Indonesia 2013).JPG|thumb|center|500px|Add caption here]] | [[File:130730 MHP Troubleshooting Poster (GIZ EnDev Indonesia 2013).JPG|thumb|center|500px|Add caption here]] | ||
Line 14: | Line 12: | ||
[[File:130730 PV-VP Troubleshooting Poster (GIZ EnDev Indonesia 2013).JPG|thumb|center|500px|Add caption here]] | [[File:130730 PV-VP Troubleshooting Poster (GIZ EnDev Indonesia 2013).JPG|thumb|center|500px|Add caption here]] | ||
− | + | [[File:130730 EnDev Indonesia - Catchment Area Management Poster - English.jpg|thumb|center|500px|Add caption here]] | |
<br/> | <br/> | ||
Line 20: | Line 18: | ||
[[File:MHP Troubleshooting Poster for Indonesian MHP operators - September 2012.JPG|thumb|center|500px|MHP Troubleshooting Poster for Indonesian MHP operators - September 2012|alt=MHP Troubleshooting Poster for Indonesian MHP operators - September 2012]] | [[File:MHP Troubleshooting Poster for Indonesian MHP operators - September 2012.JPG|thumb|center|500px|MHP Troubleshooting Poster for Indonesian MHP operators - September 2012|alt=MHP Troubleshooting Poster for Indonesian MHP operators - September 2012]] | ||
− | |||
− | |||
<br/> | <br/> | ||
Line 34: | Line 30: | ||
<br/><references /> | <br/><references /> | ||
+ | [[Category:Indonesia]] | ||
+ | [[Category:Troubleshooting]] | ||
+ | [[Category:Mini-grid]] | ||
+ | [[Category:PV_Mini-grid]] | ||
+ | [[Category:Solar]] | ||
+ | [[Category:Rural_Electrification]] | ||
+ | [[Category:Off-grid]] | ||
[[Category:Micro_Hydro]] | [[Category:Micro_Hydro]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 01:49, 30 July 2013
Overview
GIZ Indonesia, as part of EnDev Indonesia, has been supporting the sustainability of micro-hydro power (MHP) and photo-voltaic village power (PV-VP; solar mini-grid) installations in Indonesia since 2006 and 2013 respectively. As part of these efforts, capacity building initiatives for 'Village Management Team (VMT) are conducted, along with the distribution of a range of information materials (e.g. operator log book, treasurer cash book, etc). One such information material is an A0 full colour poster depicting, in the form of a flowchart, the basic operational troubleshooting steps that an MHP and PV-VP operator can perform.
The poster was designed in MSPowerPoint, in order to facilitate easy revision and translation. Current version is available in English and Bahasa Indonesia and can be dowloaded below.
In addition, a poster of catchment area managment is also provided to operators, as means to sensitise rural communities about the link between an MHP's operational performance and the environment.
- The Image below shows field surveyor Mr Ari Bimo Prakoso, GIZ Indonesia, handing over a poster to an MHP operator in Sumatera, Indonesia.
Further Information
- MHP Troubleshooting Poster - GIZ Indonesia - September 2012 (pdf)
- PV-VP Troubleshooting Poster - GIZ Indonesia - May 2013 (pdf)
- MHP Troubleshooting Poster - GIZ Indonesia (MSPowerPoint template)
- PV-VP Troubleshooting Poster - GIZ Indonesia (MSPowerPoint template)