Difference between revisions of "Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project - Economic and Financial Analysis"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 18: Line 18:
 
|PRC type financing=Examples of Economic & Financial Analysis
 
|PRC type financing=Examples of Economic & Financial Analysis
 
|PRC type other=
 
|PRC type other=
|PRC technology=Hydro; Storage
+
|PRC technology hydro=Hydro; Storage
 +
|PRC technology storage=Storage
 
|PRC abstract=The development objective is to significantly increase the peaking capacity of the power generation system in Java-Bali in an environmentally and socially sustainable way and strengthen the institutional capacity of the project implementing entity, Perusahaan Listrik Negara (PLN), in hydropower planning, development and operation.
 
|PRC abstract=The development objective is to significantly increase the peaking capacity of the power generation system in Java-Bali in an environmentally and socially sustainable way and strengthen the institutional capacity of the project implementing entity, Perusahaan Listrik Negara (PLN), in hydropower planning, development and operation.
  
Line 24: Line 25:
 
}}
 
}}
  
 +
[[Category:Hydro]]
 +
[[Category:PRC_Hydro]]
 +
[[Category:Financing_and_Funding]]
 +
[[Category:PRC_Project_Financing]]
 +
[[Category:Indonesia]]
 +
[[Category:Project_Resource_Center]]
 
[[Category:PRC_Storage]]
 
[[Category:PRC_Storage]]
[[Category:Project_Resource_Center]]
 
[[Category:Indonesia]]
 
[[Category:PRC_Project_Financing]]
 
[[Category:Financing_and_Funding]]
 
[[Category:PRC_Hydro]]
 
[[Category:Hydro]]
 

Revision as of 16:00, 11 February 2014



Title of Document '
Abstract
File Download
Original Source
Year
Region/Country
Language(s)
Document Type
Technology
Connection Type