Difference between revisions of "Training Materials - Off Grid Systems"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 10: Line 10:
 
! Training !! Country/Language !! Description
 
! Training !! Country/Language !! Description
 
|-
 
|-
| [[1B_HC_main_parts_EUT_English_1.pdf|Introduction to Phase 1B  
+
| [[1B_HC_main_parts_EUT_English_1.pdf|Introduction to Phase 1B HC PV Power supply system]]
HC PV Power supply system]]
 
 
| Ethiopia/English  
 
| Ethiopia/English  
 
|  
 
|  
Line 31: Line 30:
 
*Learn about the system installed at the HC in collaboration with FMoH and GIZ-ECO
 
*Learn about the system installed at the HC in collaboration with FMoH and GIZ-ECO
 
*Learn the care and maintain the installed system require
 
*Learn the care and maintain the installed system require
 +
|
 +
|-
 +
| [[Sunny island.pdf|Sunny Island]]
 +
| Ethiopia/English-Amharic
 +
|
 +
*Switching On-Off the Sunny Island
 +
*Restarting Sunny Island after Automatic Shutdown
 
|}
 
|}
  
 
== Grid conected systems ==
 
== Grid conected systems ==

Revision as of 12:31, 23 February 2012

Off grid systems

Giving information and proper training to the stakeholders of a solar off project system is very important, especially when doing rural electrification projects where lack of information can compromise the success of the project.

Examples of training materials from different EnDev projects are presented:

For technicians:

Training Country/Language Description
Introduction to Phase 1B HC PV Power supply system Ethiopia/English
  • Identify main parts of Health Center PV power supply system
  • Perform routine service for the installed PV system
  • Practice safe operation and appropriate utilization of the system

For End User operator:

Training Country/Language Description
1A Basics solar PV System Ethiopia/English
  • Learn basics of solar PV light and power supply system and its main components
  • Learn about the advantages and limitations of solar PV power supply System
  • Learn about the system installed at the HC in collaboration with FMoH and GIZ-ECO
  • Learn the care and maintain the installed system require
Sunny Island Ethiopia/English-Amharic
  • Switching On-Off the Sunny Island
  • Restarting Sunny Island after Automatic Shutdown

Grid conected systems