Difference between revisions of "Rusumo"
From energypedia
***** (***** | *****) (Created page with "{{HPDB |HPDBCountry=Rwanda |HPDBCity/Town= Rusumo |HPDBCoordinates=-0.944722, 31.7767 |HPDBDate of Commission=2020/??/?? |HPDBStream Name= Kagera River |HPDBPower=80,000 |HPDBMin...") |
***** (***** | *****) m |
||
Line 1: | Line 1: | ||
{{HPDB | {{HPDB | ||
|HPDBCountry=Rwanda | |HPDBCountry=Rwanda | ||
− | |HPDBCity/Town= Rusumo | + | |HPDBCity/Town=Rusumo |
|HPDBCoordinates=-0.944722, 31.7767 | |HPDBCoordinates=-0.944722, 31.7767 | ||
− | |HPDBDate of Commission=2020 | + | |HPDBDate of Commission=2020 |
− | |HPDBStream Name= Kagera River | + | |HPDBStream Name=Kagera River |
|HPDBPower=80,000 | |HPDBPower=80,000 | ||
|HPDBMini Grid=No | |HPDBMini Grid=No | ||
|HPDBDam Type=Run of river | |HPDBDam Type=Run of river | ||
}} | }} |
Latest revision as of 08:11, 3 September 2012
Back to the Hydropower Sites Database
General Information
Country: | Rwanda |
---|---|
City/Town: | Rusumo |
Coordinates (Powerhouse): | 0° 56' 41.00" S, 31° 46' 36.12" E |
Year of Commission: | 2020 |
Basin Name: | |
Stream Name: | Kagera River |
Developer: | |
Operator: | |
Project Status: | |
Any other uses of the water source: | |
Contact: | |
Comment: | |
Link to Photos: |
Technical Information
Power: (kW) | 80,000 |
---|---|
Energy (kWh/a): | |
Capacity Factor (%): | |
Penstock Diameter (mm): | |
Penstock Length (m): | |
Penstock Material (m³/s): | |
Maximum Flow of the Penstock (m³/s): | |
Minimum Flow of the Stream (m³/s): | |
Head (m): | |
Turbine Type: | |
Turbine Manufacturer: | |
Generator Type: | |
Generator Capacity (kW): | |
Generator Manufacturer: | |
Comment: |
Mini/Island Grid Information
Mini Grid: | No |
---|---|
Load Control Information: | |
Connection Type: | |
Public Lighting: | |
Length of Transmission Line (m): | |
Voltage (v): | |
Transmission Conductor (type) : | |
Diameter of Conductor (mm²): | |
Transformer Rating (kVA): | |
Link to Grid: | |
S.W.E.R: | |
Operational Period (Xdays/year): | |
Comment: |
Dam Information
Dam Type: |
Run of river |
---|---|
Dam Construction Material: | |
Dam Height [m]: | |
Length of Dam [m]: | |
Storage Volume of Reservoir (m³): | |
Flood Storage of Reservoir: | |
Channel Material: | |
Comment: |
Economic Information
Cost (€): | |
---|---|
Donor/Financier & Percentage: | |
Tariff Levels: | |
Connected Households: | |
Connection Cost (€): | |
Cost to be Covered by Households (%): | |
Comment: | |
Link to Cost Breakdown: |