Results of the discussions during Mata 2009 about: | Results of the discussions during Mata 2009 about: | ||
− | + | *Which tariffs and billing systems have been successful? | |
− | *Which tariffs and billing systems have been successful? | ||
*Which challenges have been identified? | *Which challenges have been identified? | ||
+ | <br/> | ||
− | + | {| cellpadding="7" cellspacing="1" border="1" style="width: 98%;" | |
− | {| cellpadding="7" cellspacing="1" border="1" | ||
|- | |- | ||
− | | | + | | style="width: 30%;" | '''Country/Project/System''' |
− | | | + | | style="width: 34%;" | '''System applied successful''' |
| '''Challenges''' | | '''Challenges''' | ||
|- | |- | ||
Line 19: | Line 19: | ||
| | | | ||
*'''Communal-set tariffs''' | *'''Communal-set tariffs''' | ||
− | |||
#'''Flat rate''' (households) | #'''Flat rate''' (households) | ||
#'''Item based''' (eg # of bulbs) | #'''Item based''' (eg # of bulbs) | ||
Line 41: | Line 40: | ||
| | | | ||
*Expected challenges: | *Expected challenges: | ||
− | |||
#billing - recovery rate too low | #billing - recovery rate too low | ||
#monitoring of applied devices | #monitoring of applied devices | ||
#Static system | #Static system | ||
− | |||
*risk: pilot --> not cost covering | *risk: pilot --> not cost covering | ||
Line 57: | Line 54: | ||
| | | | ||
*'''Fee for service with pre-paid metering''' | *'''Fee for service with pre-paid metering''' | ||
− | |||
#complete financial failure | #complete financial failure | ||
#conceptual design resulted in no ownership and caused vandalism, theft,... | #conceptual design resulted in no ownership and caused vandalism, theft,... | ||
Line 75: | Line 71: | ||
| | | | ||
*'''Multi-level tariff''' | *'''Multi-level tariff''' | ||
− | |||
#'''prepaid''' and '''post paid metered''' | #'''prepaid''' and '''post paid metered''' | ||
− | #[[Tariffs# | + | #[[Tariffs#Lifeline tariff - Ghana|lifeline tariff]] |
| | | | ||
Line 93: | Line 88: | ||
| | | | ||
*power production to low for overall demand | *power production to low for overall demand | ||
− | |||
#utility prefers to connect only big consumers | #utility prefers to connect only big consumers | ||
− | |||
*off grid tariff (MHP) lower than grid tariff | *off grid tariff (MHP) lower than grid tariff | ||
− | |||
#not cost covering | #not cost covering | ||
Line 104: | Line 96: | ||
| | | | ||
*recently change from '''flat rate''' to '''prepaid tariff''' | *recently change from '''flat rate''' to '''prepaid tariff''' | ||
− | |||
#resulted in lower electricity consumption | #resulted in lower electricity consumption | ||
Line 117: | Line 108: | ||
| | | | ||
*one tariff nationwide | *one tariff nationwide | ||
− | |||
#not cost covering under all conditions | #not cost covering under all conditions | ||
Line 128: | Line 118: | ||
|} | |} | ||
− | + | <br/> | |
= References<br/> = | = References<br/> = | ||
Line 134: | Line 124: | ||
<references /> | <references /> | ||
+ | <br/> | ||
− | + | <br/> | |
− | |||
[[Tariffs|⇒ Link to Tariffs in the Hydro Portal]] | [[Tariffs|⇒ Link to Tariffs in the Hydro Portal]] | ||
Line 142: | Line 132: | ||
[[Metering and billing systems|⇒ Link to Metering and billing systems]] | [[Metering and billing systems|⇒ Link to Metering and billing systems]] | ||
+ | [[Category:Financing_and_Funding]] | ||
+ | [[Category:Zambia]] | ||
+ | [[Category:South_Africa]] | ||
+ | [[Category:Senegal]] | ||
+ | [[Category:Rwanda]] | ||
+ | [[Category:Pakistan]] | ||
+ | [[Category:Morocco]] | ||
+ | [[Category:Indonesia]] | ||
+ | [[Category:Ghana]] | ||
+ | [[Category:Ethiopia]] | ||
+ | [[Category:China]] | ||
[[Category:Burkina_Faso]] | [[Category:Burkina_Faso]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 07:49, 25 April 2013
This article needs to be revised. Please rewrite the article according to the specifications below. Only remove this maintenance box after a thorough revision of this article. See the discussion page for more details or start a discussion there. In particular the following aspects and passages have been specified to be in need for a revision: |
Results - Mata 2009
Results of the discussions during Mata 2009 about:
- Which tariffs and billing systems have been successful?
- Which challenges have been identified?
Country/Project/System | System applied successful | Challenges |
Indonesia / MHP /Micro Hydro Schemes |
|
|
Pakistan |
|
|
planned in Ethiopia / EnDev / Micro Hydro Schemes |
|
|
Republic South Africa / SHS Pakistan / SHS |
| |
Senegal / SHS Burkina Faso / SHS |
|
|
Ghana / grid |
|
|
China / grid - households |
|
|
Rwanda / grid |
|
|
Zambia / grid |
|
|
Senegal / Minigrids |
|
|
Marocco / planned for island grid |
|
References