Difference between revisions of "Financing Concentrating Solar Power"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 9: Line 9:
 
| style="width: 454px" | __TOC__
 
| style="width: 454px" | __TOC__
  
| style="width: 308px" | [[File:CSP Icon.png|right|32px|Go back to the CSP Overview|alt=Go back to the CSP Overview|link=Concentrating Solar Power (CSP)]][[Concentrating_Solar_Power_(CSP)|Go back to the CSP Overview]]
+
| style="width: 308px" | [[File:CSP Icon.png|right|32px|Go back to the CSP Overview|alt=Go back to the CSP Overview|link=Concentrating Solar Power (CSP)]][[Concentrating Solar Power (CSP)|Go back to the CSP Overview]]
 
|}
 
|}
  
Line 43: Line 43:
 
<br/>
 
<br/>
  
== Costs of CSP ==
+
= Costs of CSP =
  
 
As of 9 September 2009, the cost of building a CSP station was typically about US$2.50 to $4/Watt <ref>Poornima Gupta and Laura Isensee (11 September 2009). Carol Bishopric, ed. "Google Plans New Mirror For Cheaper Solar Power". Global Climate and Alternative Energy Summit. San Francisco: Reuters & businessworld.in.</ref>. Thus a 250 MW CSP station would cost $600–1000 million. New CSP stations may be economically competitive with fossil fuels.<br/>
 
As of 9 September 2009, the cost of building a CSP station was typically about US$2.50 to $4/Watt <ref>Poornima Gupta and Laura Isensee (11 September 2009). Carol Bishopric, ed. "Google Plans New Mirror For Cheaper Solar Power". Global Climate and Alternative Energy Summit. San Francisco: Reuters & businessworld.in.</ref>. Thus a 250 MW CSP station would cost $600–1000 million. New CSP stations may be economically competitive with fossil fuels.<br/>
Line 65: Line 65:
 
<br/>
 
<br/>
  
== CSP DropBox ==
+
= Further Information & CSP DropBox =
  
 
*For more information on financing of CSP Projects check out the [https://www.dropbox.com/sh/hfdl5xd3vo6w5om/3ikqMUkqs6 CSP DropBox]
 
*For more information on financing of CSP Projects check out the [https://www.dropbox.com/sh/hfdl5xd3vo6w5om/3ikqMUkqs6 CSP DropBox]

Revision as of 14:25, 5 June 2014

Go back to the CSP Overview
Go back to the CSP Overview

Overview

The parameters that determine the optimal plant design are many. An important consideration is the role of thermal energy storage. Thermal energy storage increases costs, but allows higher capacity factors, dispatchable generation when the sun is not shining and/ or the maximisation of generation at peak demand times. Costs increase, because of the investment in thermal energy storage, but also if the solar field size is increased to allow operation of the plant and storage of solar heat to increase the capacity factor[1].

The role of independent regulators should be strengthened. In particular, they need to be equipped with an adequate, separate budget, clearly defined powers to make binding decisions, and irrevocable, fixed-term appointments for senior staff. Independently of the specific market design and industry structure, it is essential that costreflective price signals exist and are able to trigger investments. The phase-out of all fossil fuel subsidies is a key tool to achieve this. While cost-reflective price signals are needed to ensure energy efficiency and to relieve state budgets, it must be ensured that electricity does not become unaffordable for vulnerable consumers. This section elaborates on the key actions required today to facilitate the transition to renewables beyond 2020. It treats all indispensable elements of the transition: the investment framework, renewables support, (international) transmission as well as industrial policy and local value creation.


Comparison of CSP Technologies

Parabolic trough plant are the most widely commercially deployed CSP plant, but are not a mature technology and improvements in performance and cost reductions are expected. Virtually all PTC systems currently deployed do not have thermal energy storage and only generate electricity during daylight hours. Most CSP projects currently under construction or development are based on parabolic trough technology, as it is the most mature technology and shows the lowest development risk.

Parabolic troughs and solar towers, when combined with thermal energy storage, can meet the requirements of utility-scale, schedulable power plant. Solar tower and linear Fresnel systems are only beginning to be deployed and there is significant potential to reduce their capital costs and improve performance, particularly for solar towers. However, parabolic trough systems, with their longer operational experience of utility-size plants, represent a less flexible, but low-risk option today.

Solar towers using molten-salt as a high temperature heat transfer fluid and storage medium (or other high temperature medium) appear to be the most promising CSP technology for the future. This is based on their low energy storage costs, the high capacity factor achievable, greater efficiency of the steam cycle and their firm output capability. While the levelised cost of electricity (LCOE) of parabolic trough systems does not tend to decline with higher capacity factors, the LCOE of solar towers tends to decrease as the capacity factor increases. This is mainly due to the significantly lower specific cost (up to three times lower) of the molten-salt energy storage in solar tower plants.

CSP technologies offer a great opportunity for local manufacturing, which can stimulate local economic development, including job creation. It is estimated that solar towers can offer more local opportunities than trough systems (Ernst & Young and Fraunhofer, 2010)[2].


Capital Flow CSP[3]

  • Abengoa Solar – financed PS10, PS20, Solnova ( 2 x 50MW) in Spain and Algeria & Morocco ISCCS with bank debt and same plan for APS Solana (280 MW) in US
  • Solar Millennium - financed Andasol 1 & 2 in Spain with bank
  • Acciona – financed Nevada Solar 1 (64MW) in US with bank debt
  • GEF provided $200M for ISCCS projects in Morocco (in construction), Egypt & Mexico - - India project was cancelled.
  • Trough companies didn’t anticipate major problems attracting tax equity investors/commercial debt as the ITCs were renewed last year but the global financial crisis has created new uncertainty and US projects are now being delayed
  • Ample equity available for start-ups as evidenced by: Ausra, SkyFuel, eSolar, Bright Source and Solar Reserve all conducting successful VC fund raises


Costs of CSP

As of 9 September 2009, the cost of building a CSP station was typically about US$2.50 to $4/Watt [4]. Thus a 250 MW CSP station would cost $600–1000 million. New CSP stations may be economically competitive with fossil fuels.

Nathaniel Bullard, a solar analyst at Bloomberg New Energy Finance, has calculated that the cost of electricity at the Ivanpah Solar Power Facility, a CSP.

IRENA has published on June 2012 a series of studies titled: "Renewable Energy Cost Analysis". The CSP study shows the cost of both building and operation of CSP plants. Costs are expected to decrease, but there are insufficient installations to clearly establish the learning curve. As of March 2012, there were 1.9 GW of CSP installed, with 1.8 GW of that being parabolic trough[5].


Levelized Cost of Electricity

The LCOE of renewable energy technologies varies by technology, country and project based on the renewable energy resource, capital and operating costs, and the efficiency / performance of the technology. The approach used in the analysis presented here is based on a discounted cash flow (DCF) analysis. This method of calculating the cost of renewable energy technologies is based on discounting financial flows (annual, quarterly or monthly) to a common basis, taking into consideration the time value of money. Given the capital intensive nature of most renewable power generation technologies and the fact fuel costs are low, or often zero, the weighted average cost of capital (WACC), often also referred to as the discount rate, used to evaluate the project has a critical impact on the LCOE. There are many potential trade-offs to be considered when developing an LCOE modeling approach. The approach taken by IRENA is relatively simplistic, given the fact that the model needs to be applied to a wide range of technologies in different countries and regions.


LCOE CSP.jpg
LCOE (levelized cost of energy) Concentrating Solar Power



Further Information & CSP DropBox

  • For more information on financing of CSP Projects check out the CSP DropBox


References

  1. 2012_IRENA_Costs of CSP
  2. 2012_IRENA_Costs of CSP
  3. 2009_International Finance Cooperation_CSP and the Green Technology Fund
  4. Poornima Gupta and Laura Isensee (11 September 2009). Carol Bishopric, ed. "Google Plans New Mirror For Cheaper Solar Power". Global Climate and Alternative Energy Summit. San Francisco: Reuters & businessworld.in.
  5. Renewable Energy Cost Analysis – Concentrating Solar Power. irena.org