Difference between revisions of "Small Hydropower Promotion Project (SHPP) Nepal Report"
From energypedia
***** (***** | *****) |
***** (***** | *****) m |
||
Line 1: | Line 1: | ||
+ | [[Portal:Hydro|►Back to Hydro Portal]] | ||
=== [[Small Hydropower Promotion Project (SHPP) - support from water to wire|Small Hydropower Promotion Project (SHPP) – Support From Water to W]][[Small Hydropower Promotion Project (SHPP) - support from water to wire|ire]] === | === [[Small Hydropower Promotion Project (SHPP) - support from water to wire|Small Hydropower Promotion Project (SHPP) – Support From Water to W]][[Small Hydropower Promotion Project (SHPP) - support from water to wire|ire]] === | ||
Line 36: | Line 37: | ||
<br/> | <br/> | ||
+ | [[Category:Hydro]] | ||
[[Category:Nepal]] | [[Category:Nepal]] | ||
− |
Revision as of 10:25, 14 August 2014
Small Hydropower Promotion Project (SHPP) – Support From Water to Wire
- Background of the project
- Ten years of Small Hydro Promotion Programme in Nepal
- Lines of SHPP’s intervention
- SHPP’s achievements
SHPP - Nepal Supporting Financial institutions
Risk Management (Ratna Sansar Shrestha, FCA)
Project Financing (Ratna Sansar Shrestha, FCA)
SHPP - Off-grid rural electrification with micro/mini hydropower
- AEPC Subsidy Scheme for mini/micro hydropower
- Successes of MMHP subsidy scheme
- Challenges of MMHP subsidy scheme
- SHPP’s support
SHPP - Off-Grid to On-Grid and the PEA (Power Exchange Agreement)
- Main objectives of the PEA
- Workshop Objective / AEPC perspective
- National Utility (NEA) Perspective
- SHPP presentation on advantages of the PEA
- Conclusion and Current Status