Kisiizi Hospital

From energypedia
Revision as of 22:57, 12 November 2012 by ***** (***** | *****) (Created page with "{{HPDB |HPDBCountry=Uganda |HPDBCity/Town=Kisiizi |HPDBDate of Commission=2009 |HPDBDeveloper=Friends of Kisiizi UK |HPDBOperator=Kisiizi Power Ltd |HPDBProject Status=Completed ...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Back to the Hydropower Sites Database

General Information

Country: Uganda
City/Town: Kisiizi
Coordinates (Powerhouse):
Year of Commission: 2009
Basin Name:
Stream Name:
Developer: Friends of Kisiizi UK
Operator: Kisiizi Power Ltd
Project Status: Completed
Any other uses of the water source:
Contact: pauldarrall50@aol.com
Comment:
Link to Photos: www.kisiizihospital.org.ug

Technical Information

Power: (kW) 300
Energy (kWh/a):
Capacity Factor (%):
Penstock Diameter (mm): 800
Penstock Length (m): 45
Penstock Material (m³/s): Helically welded 8mm steel
Maximum Flow of the Penstock (m³/s): 1
Minimum Flow of the Stream (m³/s): 2
Head (m): 30
Turbine Type: Crossflow
Turbine Manufacturer: Ossberger
Generator Type: Synchronous Brushless
Generator Capacity (kW): 500
Generator Manufacturer:
Comment: Gearbox 2:1

Mini/Island Grid Information

Mini Grid: Yes
Load Control Information: Load Tank
Connection Type:
Public Lighting: Yes
Length of Transmission Line (m): 10000
Voltage (v): 11000
Transmission Conductor (type) : ACSR
Diameter of Conductor (mm²): 6
Transformer Rating (kVA): 315
Link to Grid: Off Grid
S.W.E.R: No
Operational Period (Xdays/year): 365
Comment: 300 external paying customers

Dam Information

Dam Type:

Run of river
Dam Construction Material: Concrete Gravity Dam
Dam Height [m]: 2
Length of Dam [m]: 3
Storage Volume of Reservoir (m³): 0
Flood Storage of Reservoir: No
Channel Material: Stone/cement
Comment: Water diverted from 30m waterfall

Economic Information

Cost (€): 900000
Donor/Financier & Percentage: World Bank
Tariff Levels: Same as Umeme
Connected Households: 300
Connection Cost (€): Individually priced
Cost to be Covered by Households (%):
Comment: cost of service connection and meter
Link to Cost Breakdown:


Non-profit company to return all profit to hospital to subsidise treatment for poor people, including psychiatric.