Micro Hydro Power (MHP) - Ethiopia, Gobecho I

From energypedia
Revision as of 13:00, 21 March 2011 by ***** (***** | *****)

Location of the site:

  • Country: Ethiopia
  • District: Bona Zuria
  • GPS Coordinates: 6º34’40’’N 38º41’50.3’’ E

Start of construction: at the beginning of 2009


Date of Commissioning: 26 Feb. 2010


Ownership / Operation Modell:

Gobecho Genet Electric users cooperative/Community based cooperative Society


Tariff structure:

Flat rate/monthly based per appliance


Turbine:

T-3 Cross flow turbine/Locally manufactured


Generator:

A.C. Synchronous Generator/ Power 10kW, 400v, 50hz, 1500r/min, 3 phase