General Information
Country: | |
---|---|
City/Town: | Helmand |
Coordinates (Powerhouse): | The following coordinate was not recognized: Latitude= 32.322, Longitude= 65.119.The following coordinate was not recognized: Latitude= 32.322, Longitude= 65.119. |
Year of Commission: | 1975 |
Basin Name: | Helmand |
Stream Name: | Helmand |
Developer: | |
Operator: | Ministry of Energy and Water Afghanistan. |
Project Status: | Completed |
Any other uses of the water source: | |
Contact: | |
Comment: | |
Link to Photos: |
Technical Information
Power: (kW) | 33000 |
---|---|
Energy (kWh/a): | |
Capacity Factor (%): | |
Penstock Diameter (mm): | |
Penstock Length (m): | |
Penstock Material (m³/s): | |
Maximum Flow of the Penstock (m³/s): | |
Minimum Flow of the Stream (m³/s): | |
Head (m): | |
Turbine Type: | |
Turbine Manufacturer: | |
Generator Type: | |
Generator Capacity (kW): | |
Generator Manufacturer: | |
Comment: | The new 18.5 MW Unit 2 turbine/generator has been contracted to China Machine Building International Corporation |
Mini/Island Grid Information
Mini Grid: | No |
---|---|
Load Control Information: | |
Connection Type: | |
Public Lighting: | |
Length of Transmission Line (m): | |
Voltage (v): | |
Transmission Conductor (type) : | |
Diameter of Conductor (mm²): | |
Transformer Rating (kVA): | |
Link to Grid: | |
S.W.E.R: | |
Operational Period (Xdays/year): | |
Comment: |
Dam Information
Dam Type: |
|
---|---|
Dam Construction Material: | |
Dam Height [m]: | 100 |
Length of Dam [m]: | 270 |
Storage Volume of Reservoir (m³): | |
Flood Storage of Reservoir: | |
Channel Material: | |
Comment: |
Economic Information
Cost (€): | |
---|---|
Donor/Financier & Percentage: | |
Tariff Levels: | |
Connected Households: | |
Connection Cost (€): | |
Cost to be Covered by Households (%): | |
Comment: | |
Link to Cost Breakdown: |