Gikonge

From energypedia
Revision as of 14:31, 16 October 2012 by ***** (***** | *****) (Created page with "{{HPDB |HPDBCountry=Burundi |HPDBDate of Commission=1988 |HPDBStream Name=Mubarazi |HPDBOperator=REGIDESO |HPDBCommentGenI=Under Rehabilitation |HPDBPower=850 (2x0.425) |HPDBC...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Back to the Hydropower Sites Database

General Information

Country: Burundi
City/Town:
Coordinates (Powerhouse):
Year of Commission: 1988
Basin Name:
Stream Name: Mubarazi
Developer:
Operator: REGIDESO
Project Status:
Any other uses of the water source:
Contact:
Comment: Under Rehabilitation
Link to Photos:

Technical Information

Power: (kW) 850 (2x0.425)
Energy (kWh/a):
Capacity Factor (%):
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type:
Turbine Manufacturer:
Generator Type:
Generator Capacity (kW):
Generator Manufacturer:
Comment: Muramvya Local Network 10kV

Mini/Island Grid Information

Mini Grid: No
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment:

Dam Information

Dam Type:

Dam Construction Material:
Dam Height [m]:
Length of Dam [m]:
Storage Volume of Reservoir (m³):
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€):
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown: