Gikonge
From energypedia
Revision as of 14:31, 16 October 2012 by ***** (***** | *****) (Created page with "{{HPDB |HPDBCountry=Burundi |HPDBDate of Commission=1988 |HPDBStream Name=Mubarazi |HPDBOperator=REGIDESO |HPDBCommentGenI=Under Rehabilitation |HPDBPower=850 (2x0.425) |HPDBC...")
Back to the Hydropower Sites Database
General Information
Country: | Burundi |
---|---|
City/Town: | |
Coordinates (Powerhouse): | |
Year of Commission: | 1988 |
Basin Name: | |
Stream Name: | Mubarazi |
Developer: | |
Operator: | REGIDESO |
Project Status: | |
Any other uses of the water source: | |
Contact: | |
Comment: | Under Rehabilitation |
Link to Photos: |
Technical Information
Power: (kW) | 850 (2x0.425) |
---|---|
Energy (kWh/a): | |
Capacity Factor (%): | |
Penstock Diameter (mm): | |
Penstock Length (m): | |
Penstock Material (m³/s): | |
Maximum Flow of the Penstock (m³/s): | |
Minimum Flow of the Stream (m³/s): | |
Head (m): | |
Turbine Type: | |
Turbine Manufacturer: | |
Generator Type: | |
Generator Capacity (kW): | |
Generator Manufacturer: | |
Comment: | Muramvya Local Network 10kV |
Mini/Island Grid Information
Mini Grid: | No |
---|---|
Load Control Information: | |
Connection Type: | |
Public Lighting: | |
Length of Transmission Line (m): | |
Voltage (v): | |
Transmission Conductor (type) : | |
Diameter of Conductor (mm²): | |
Transformer Rating (kVA): | |
Link to Grid: | |
S.W.E.R: | |
Operational Period (Xdays/year): | |
Comment: |
Dam Information
Dam Type: |
|
---|---|
Dam Construction Material: | |
Dam Height [m]: | |
Length of Dam [m]: | |
Storage Volume of Reservoir (m³): | |
Flood Storage of Reservoir: | |
Channel Material: | |
Comment: |
Economic Information
Cost (€): | |
---|---|
Donor/Financier & Percentage: | |
Tariff Levels: | |
Connected Households: | |
Connection Cost (€): | |
Cost to be Covered by Households (%): | |
Comment: | |
Link to Cost Breakdown: |