DIA005 - Melidi

From energypedia
Revision as of 07:10, 17 October 2012 by ***** (***** | *****) (Created page with "{{HPDB |HPDBCountry=Indonesia |HPDBCity/Town=Aceh Timur |HPDBCoordinates=4° 17' 15.623"N, 97° 43' 38.723"E |HPDBDate of Commission=2011 |HPDBBasin Name=Melidi |HPDBStream Name=...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Back to the Hydropower Sites Database

General Information

Country: Indonesia
City/Town: Aceh Timur
Coordinates (Powerhouse): 4° 17' 15.62" N, 97° 43' 38.72" E
Year of Commission: 2011
Basin Name: Melidi
Stream Name: Melidi
Developer:
Operator:
Project Status:
Any other uses of the water source:
Contact:
Comment:
Link to Photos:

Technical Information

Power: (kW) 12
Energy (kWh/a):
Capacity Factor (%):
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s): 0.65
Minimum Flow of the Stream (m³/s):
Head (m): 4
Turbine Type:
Turbine Manufacturer:
Generator Type:
Generator Capacity (kW):
Generator Manufacturer:
Comment:

Mini/Island Grid Information

Mini Grid: No
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment:

Dam Information

Dam Type:

Dam Construction Material:
Dam Height [m]:
Length of Dam [m]:
Storage Volume of Reservoir (m³):
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€):
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown: