Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Checklist for the Construction of a Biogas Plant"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
 
(3 intermediate revisions by 2 users not shown)
Line 2: Line 2:
 
= Overview =
 
= Overview =
  
The checklist for the construction of a biogas plant is summarized below
+
The checklist for the construction of a biogas plant is summarized below.
  
 
<br/>
 
<br/>
*'''Planning of the Biogas Plant'''
 
  
i.e. [[Siting of the Biogas Unit|site evaluation]], [[Balancing Biogas Production and Energy Demand|determination of energy demand and biomass supply]] / biogas yield, [[Sizing of the Biogas Plant|plant sizing]], selection of plant [[Types of Biogas Digesters and Plants#Biogas Plant Types and Design|design]], how and where to use the biogas, etc., in accordance with the [[Planning Guide for Biogas Plants|planning guide]]
+
= Checklist for the Construction =
 +
 
 +
*<u>'''Planning of the Biogas Plant'''</u><ul style="margin-left: 40px;">
 +
<li>i.e. [[Siting of the Biogas Unit|site evaluation]],</li>
 +
<li>[[Balancing Biogas Production and Energy Demand|determination of energy demand and biomass supply]] / biogas yield,</li>
 +
<li>[[Sizing of the Biogas Plant|plant sizing]],</li>
 +
<li>selection of plant [[Types of Biogas Digesters and Plants#Biogas Plant Types and Design|design]],</li>
 +
<li>how and where to use the biogas, etc., in accordance with the [[Planning Guide for Biogas Plants|planning guide]]</li>
 +
</ul>
 +
</ul>
  
 
<br/>
 
<br/>
*'''Stipulate the plant's location and elaborate a site plan'''
 
  
including all buildings, gas pipes, gas appliances and fields to be fertilized with digested slurry
+
*<u>'''Stipulate the plant's location and elaborate a site plan'''</u><ul style="margin-left: 40px;">
 +
<li>including all buildings, gas pipes, gas appliances and fields to be fertilized with digested slurry</li>
 +
</ul>
 +
</ul>
  
 
<br/>
 
<br/>
*'''Draft a technical drawing showing all plant components'''
 
  
i.e. mixing pit, connection to stabling, inlet / outlet, digester, gas-holder, gas pipes, slurry storage
+
*<u>'''Draft a technical drawing showing all plant components'''</u><ul style="margin-left: 40px;">
 +
<li>i.e. mixing pit, connection to stabling, inlet / outlet, digester, gas-holder, gas pipes, slurry storage</li>
 +
</ul>
 +
</ul>
  
 
<br/>
 
<br/>
*'''Preparation of material / personnel requirements list and procurement of materials needed for the chosen plant''':
 
  
bricks / stones / blocks for walls and foundation<br/>
+
*<u>'''Preparation of material / personnel requirements list and procurement of materials needed for the chosen plant''':</u><ul style="margin-left: 40px;">
 +
<li>bricks / stones / blocks for walls and foundation<br/></li>
 +
<li>sand, gravel<br/></li>
 +
<li>inlet / outlet pipes<br/></li>
 +
<li>metal parts (sheet metal, angle irons, etc.)<br/></li>
 +
<li>gas pipes and fittings<br/></li>
 +
<li>paint and sealants<br/></li>
 +
<li>gas appliances<br/></li>
 +
<li>tools<br/></li>
 +
<li>mason and helper<br/></li>
 +
<li>unskilled labor<br/></li>
 +
<li>workshop for metal (gas-holder) and pipe installation<br/></li>
 +
</ul>
 +
</ul>
  
sand, gravel<br/>
+
<br/>
  
inlet / outlet pipes<br/>
+
*<u>'''Material / personnel assignment planning''', i.e. procedural planning and execution of:</u><ul style="margin-left: 40px;">
 +
<li>excavation<br/></li>
 +
<li>foundation slab<br/></li>
 +
<li>digester masonry<br/></li>
 +
<li>gasholder<br/></li>
 +
<li>rendering and sealing the masonry<br/></li>
 +
<li>mixing pit - slurry storage pit<br/></li>
 +
<li>drying out the plant<br/></li>
 +
<li>installing the gas pipe<br/></li>
 +
<li>acceptance inspection<br/></li>
 +
</ul>
 +
</ul>
  
metal parts (sheet metal, angle irons, etc.)<br/>
+
<br/>
 
 
gas pipes and fittings<br/>
 
 
 
paint and sealants<br/>
 
 
 
gas appliances<br/>
 
  
tools<br/>
+
*<u>'''Regular building supervision''' '''Commissioning'''</u><ul style="margin-left: 40px;">
 
+
<li>functional inspection of the biogas plant and its components<br/></li>
mason and helper<br/>
+
<li>starting the plant<br/></li>
 
+
</ul>
unskilled labor<br/>
+
</ul>
 
 
workshop for metal (gas-holder) and pipe installation<br/>
 
  
 
<br/>
 
<br/>
*'''Material / personnel assignment planning''', i.e. procedural planning and execution of:
 
  
excavation<br/>
+
*<u>'''Filling the plant'''</u>
  
foundation slab<br/>
+
'''​'''<br/>
 
 
digester masonry<br/>
 
 
 
gasholder<br/>
 
 
 
rendering and sealing the masonry<br/>
 
 
 
mixing pit - slurry storage pit<br/>
 
 
 
drying out the plant<br/>
 
 
 
installing the gas pipe<br/>
 
  
acceptance inspection<br/>
+
*<u>'''Training the user'''</u>
  
 
<br/>
 
<br/>
*'''Regular building supervision''' '''Commissioning'''
 
  
functional inspection of the biogas plant and its components<br/>
+
= Further Information =
  
starting the plant<br/>
+
*[[Checklist for the Planning of a Biogas Plant|Checklist for the Planning of a Biogas Plant]]
  
 
<br/>
 
<br/>
*'''Filling the plant'''
 
  
'''​'''<br/>
+
= References =
*'''Training the user'''
 
  
<br/>
+
<references /><br/>
 
</div>
 
</div>
[[Biogas|-> Back to "Biogas Portal"]]<br/>
 
 
<br/>
 
  
 
[[Category:Biogas]]
 
[[Category:Biogas]]

Latest revision as of 09:25, 7 December 2015

Overview

The checklist for the construction of a biogas plant is summarized below.


Checklist for the Construction


  • Stipulate the plant's location and elaborate a site plan
    • including all buildings, gas pipes, gas appliances and fields to be fertilized with digested slurry


    • Draft a technical drawing showing all plant components
      • i.e. mixing pit, connection to stabling, inlet / outlet, digester, gas-holder, gas pipes, slurry storage


      • Preparation of material / personnel requirements list and procurement of materials needed for the chosen plant:
        • bricks / stones / blocks for walls and foundation
        • sand, gravel
        • inlet / outlet pipes
        • metal parts (sheet metal, angle irons, etc.)
        • gas pipes and fittings
        • paint and sealants
        • gas appliances
        • tools
        • mason and helper
        • unskilled labor
        • workshop for metal (gas-holder) and pipe installation


        • Material / personnel assignment planning, i.e. procedural planning and execution of:
          • excavation
          • foundation slab
          • digester masonry
          • gasholder
          • rendering and sealing the masonry
          • mixing pit - slurry storage pit
          • drying out the plant
          • installing the gas pipe
          • acceptance inspection


          • Regular building supervision Commissioning
            • functional inspection of the biogas plant and its components
            • starting the plant


            • Filling the plant


            • Training the user


            Further Information


            References