Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Checklist for the Construction of a Biogas Plant"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 80: Line 80:
 
<br/>
 
<br/>
 
</div>
 
</div>
[[Biogas|-> Back to "Biogas Portal"]]<br/>
+
[[Portal:Biogas|-> Back to "Biogas Portal"]]<br/>
  
 
<br/>
 
<br/>
  
 
[[Category:Biogas]]
 
[[Category:Biogas]]

Revision as of 14:05, 9 July 2014

Overview

The checklist for the construction of a biogas plant is summarized below


  • Planning of the Biogas Plant

i.e. site evaluation, determination of energy demand and biomass supply / biogas yield, plant sizing, selection of plant design, how and where to use the biogas, etc., in accordance with the planning guide


  • Stipulate the plant's location and elaborate a site plan

including all buildings, gas pipes, gas appliances and fields to be fertilized with digested slurry


  • Draft a technical drawing showing all plant components

i.e. mixing pit, connection to stabling, inlet / outlet, digester, gas-holder, gas pipes, slurry storage


  • Preparation of material / personnel requirements list and procurement of materials needed for the chosen plant:

bricks / stones / blocks for walls and foundation

sand, gravel

inlet / outlet pipes

metal parts (sheet metal, angle irons, etc.)

gas pipes and fittings

paint and sealants

gas appliances

tools

mason and helper

unskilled labor

workshop for metal (gas-holder) and pipe installation


  • Material / personnel assignment planning, i.e. procedural planning and execution of:

excavation

foundation slab

digester masonry

gasholder

rendering and sealing the masonry

mixing pit - slurry storage pit

drying out the plant

installing the gas pipe

acceptance inspection


  • Regular building supervision Commissioning

functional inspection of the biogas plant and its components

starting the plant


  • Filling the plant


  • Training the user