Difference between revisions of "Chirodzo (Denis Zandamela)"

From energypedia
***** (***** | *****)
(Created page with "{{HPDB |HPDBCountry=Mozambique |HPDBCity/Town=Messica, Chirodzo, Manica |HPDBStream Name=Godhi |HPDBOperator=Denis Zandamela |HPDBAny Other Uses=Irrigation |HPDBCommentGenI=to b...")
 
***** (***** | *****)
m
 
Line 9: Line 9:
 
|HPDBMini Grid=Yes
 
|HPDBMini Grid=Yes
 
}}
 
}}
 +
 +
[[Category:Short_Pages]]

Latest revision as of 14:08, 23 May 2014


Back to the Hydropower Sites Database

General Information

Country: Mozambique
City/Town: Messica, Chirodzo, Manica
Coordinates (Powerhouse):
Year of Commission:
Basin Name:
Stream Name: Godhi
Developer:
Operator: Denis Zandamela
Project Status:
Any other uses of the water source: Irrigation
Contact:
Comment: to be assessed
Link to Photos:

Technical Information

Power: (kW) 6
Energy (kWh/a):
Capacity Factor (%):
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type:
Turbine Manufacturer:
Generator Type:
Generator Capacity (kW):
Generator Manufacturer:
Comment:

Mini/Island Grid Information

Mini Grid: Yes
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment:

Dam Information

Dam Type:

Dam Construction Material:
Dam Height [m]:
Length of Dam [m]:
Storage Volume of Reservoir (m³):
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€):
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown: