Click here to register!
Difference between revisions of "File:Assessment of Impacts and Mitigation Approaches on Near Term Coal Reduction and Power System Dispatch of Datan Conventional Gas Terminal.pdf"
From energypedia
***** (***** | *****) (User created page with UploadWizard) |
***** (***** | *****) ({{Information |Description = |Source = |Author = |Date = ~~~~~ <!-- do not change --> |Permission = }} {{PAGENAME}}) |
||
Line 17: | Line 17: | ||
{{self|cc-by-sa-3.0}} | {{self|cc-by-sa-3.0}} | ||
− | [[Category:Taiwan]] | + | [[Category:Taiwan|{{PAGENAME}}]] |
Revision as of 04:58, 13 April 2021
Summary
Description |
English: The conventional gas terminal at Datan power plant is planned to start operation by late 2022, supplying 2 CCGT with a total of 2 GW of maximum capacity.
However, the gas terminal requires the construction of a new port, under which a coralline algae ecosystem might be irreversibly damaged. In addition, conventional gas terminals will not be suitable for importing green hydrogen in the long term future, thereby they are subject to becoming stranded assets during the energy transition. A referendum has been initiated by environmental groups in Taiwan to halt the project; this assessment report investigates what could happen to near term coal reduction and power system dispatch if such referendum is passed. |
---|---|
Source |
Own Work |
Date |
2021-03-24 |
Author | |
Permission |
See license tag below. |
Licensing
|
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 04:58, 13 April 2021 | 3,000 × 1,687, 55 pages (1.66 MB) | ***** (***** | *****) | {{Information |Description = |Source = |Author = |Date = ~~~~~ <!-- do not change --> |Permission = }} {{PAGENAME}} | |
16:17, 23 March 2021 | 3,000 × 1,687, 55 pages (0 bytes) | ***** (***** | *****) | User created page with UploadWizard |
You cannot overwrite this file.
File usage
The following page uses this file: