Difference between revisions of "Kindergarten No. 11 Jargalant soum - Thermo-technical retrofitting of public buildings"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 14: Line 14:
 
==== Building data and geometry ====
 
==== Building data and geometry ====
  
    Construction year: 1975
+
&nbsp; Construction year: 1975<br/>&nbsp; Cross volume: 3,276.8 m³<br/>&nbsp; Thermal envelope: 1,730.3 m²<br/>&nbsp; Net volume: 2,835 m³<br/>&nbsp; Net floor area: 799.3 m²
  Cross volume: 3,276.8 m³
 
  Thermal envelope: 1,730.3 m²
 
  Net volume: 2,835 m³
 
  Net floor area: 799.3 m²
 
  
 
Implemented measures:
 
Implemented measures:
  
    Roof insulation with 20cm EPS- hard foam and waterproofing
+
&nbsp; Roof insulation with 20cm EPS- hard foam and waterproofing<br/>&nbsp; Wall insulation with 15cm EPS- hard foam<br/>&nbsp; New windows with 5-chamber plastic frame and double glazing<br/>&nbsp; New exterior doors<br/>&nbsp; Rehabilitation of the heating system<br/>&nbsp; Contracting company: Tulgat bagana LLC
  Wall insulation with 15cm EPS- hard foam
 
  New windows with 5-chamber plastic frame and double glazing
 
  New exterior doors
 
  Rehabilitation of the heating system
 
  Contracting company: Tulgat bagana LLC
 
  
 
==== Energy consumption ====
 
==== Energy consumption ====
  
    Before: 522 kWh/(m2 a) {calculated}
+
&nbsp; Before: 522 kWh/(m2 a) {calculated}<br/>&nbsp; After: 140 kWh /(m2 a) {metred}<br/>&nbsp; Energy saving per year: 305,332 kWh<br/>&nbsp; Coal equivalent saving: 75,020 kg / 75 t<br/>&nbsp; CO2 emission savings per year: 206 t CO2 {Estimated}
  After: 140 kWh /(m2 a) {metred}
 
  Energy saving per year: 305,332 kWh
 
  Coal equivalent saving: 75,020 kg / 75 t
 
  CO2 emission savings per year: 206 t CO2 {Estimated}
 

Revision as of 04:53, 23 November 2017

► Back to the Main Page

Key Project Data

Name
Kindergarten No. 11 Jargalant soum - Thermo-technical retrofitting of public buildings
Description
Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
Project No.
14.2128.8-002.00
Total Budget
426.233.228,00 MNT
Status
Icon Completed.png Completed
Timeframe
Type
other
Project Picture
Click to download picture

Location in Mongolia

Province
'
Loading map...

Further Information

Website
Factsheet
Organization

Tagging

Publications

Currently, there are no publications related to this project.

Events

Currently, there are no events organized by this project.

Additional Comments



Building data and geometry

  Construction year: 1975
  Cross volume: 3,276.8 m³
  Thermal envelope: 1,730.3 m²
  Net volume: 2,835 m³
  Net floor area: 799.3 m²

Implemented measures:

  Roof insulation with 20cm EPS- hard foam and waterproofing
  Wall insulation with 15cm EPS- hard foam
  New windows with 5-chamber plastic frame and double glazing
  New exterior doors
  Rehabilitation of the heating system
  Contracting company: Tulgat bagana LLC

Energy consumption

  Before: 522 kWh/(m2 a) {calculated}
  After: 140 kWh /(m2 a) {metred}
  Energy saving per year: 305,332 kWh
  Coal equivalent saving: 75,020 kg / 75 t
  CO2 emission savings per year: 206 t CO2 {Estimated}