Key Project Data
Name
Kindergarten No. 11 Jargalant soum - Thermo-technical retrofitting of public buildings
Description
Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
Project No.
Total Budget
426,233,228.00 MNT
Status
Completed
Timeframe
18.06.2017 - 09.09.2017
Type
other
Project Picture
Location in Mongolia
Province
Khovd {{#display_point: coordinates=48.006317, 91.639594|zoom=4|height=150|width=250|service=openlayers}}
Further Information
Website
Factsheet
Organization
Tagging
Publications
Currently, there are no publications related to this project.
Events
Currently, there are no events organized by this project.
Additional Comments
Building data and geometry
- Construction year: 1969
- Cross volume: 4,174.6 m³
- Thermal envelope: 2,137.1 m²
- Net volume: 3,0011.1 m³
- Net floor area: 1003.7 m²
Implemented measures:
- Roof insulation with 20cm EPS- hard foam and waterproofing
- Wall insulation with 15cm EPS- hard foam
- Floor insulatio with 10 cm EPS - hard foam
- New windows with 5-chamber plastic frame and double glazing
- New exterior doors
- Rehabilitation of the heating system
- Rehabilitation of the drinking water and sewage system
Contracting company: Tulgat bagana LLC
Energy consumption
- Before: 545 kWh/(m2 a) {calculated}
- After: 224 kWh /(m2 a) {calculated}
- Energy saving per year: 322,248 kWh
- Coal equivalent saving: 79,158.3 kg / 79.2 t
- CO2 emission savings per year: 217.8 t CO2 {Estimated}