The MHP power plant Gobecho I has a capacity of 7 kW. It was inaugurated in February 26, 2010 and is estimated to have the capacity to supply a total of 700 persons with electricity (given that no public facilities such as schools and health centers are connected). As of May 2011, the plant supplied energy for 16 households (which equals 160 connected persons, given that the average household size in the area is 10 persons), 9 coffee places, 5 shops, a cinema, a health center, a school as well as a church.
 
The MHP power plant Gobecho I has a capacity of 7 kW. It was inaugurated in February 26, 2010 and is estimated to have the capacity to supply a total of 700 persons with electricity (given that no public facilities such as schools and health centers are connected). As of May 2011, the plant supplied energy for 16 households (which equals 160 connected persons, given that the average household size in the area is 10 persons), 9 coffee places, 5 shops, a cinema, a health center, a school as well as a church.
  
-> For more information click [[:file:Fact sheet Gobecho.pdf|here]].
+
For more information click [[:file:Fact sheet Gobecho.pdf|here]].
 
*'''Start of construction:''' at the beginning of 2009
 
*'''Start of construction:''' at the beginning of 2009
 
*'''Date of Commissioning:''' Feb. 2010
 
*'''Date of Commissioning:''' Feb. 2010
Line 23: Line 24:
  
 
<br/>
 
<br/>
 +
  
 
= Pictures =
 
= Pictures =

Revision as of 11:23, 30 September 2014

Overview

Location of the Micro Hydro Power (MHP) site:

  • Country: Ethiopia
  • District: Bona
  • River: Gange
  • GPS Coordinates: 6º34’40’’N 38º41’50.3’’ E



Details

The MHP power plant Gobecho I has a capacity of 7 kW. It was inaugurated in February 26, 2010 and is estimated to have the capacity to supply a total of 700 persons with electricity (given that no public facilities such as schools and health centers are connected). As of May 2011, the plant supplied energy for 16 households (which equals 160 connected persons, given that the average household size in the area is 10 persons), 9 coffee places, 5 shops, a cinema, a health center, a school as well as a church.

► For more information click here.

  • Start of construction: at the beginning of 2009
  • Date of Commissioning: Feb. 2010
  • Ownership / Operation Modell: Gobecho Genet Electric users cooperative/Community based cooperative Society
  • Tariff structure: Flat rate/monthly based per appliance
  • Turbine: T-3 Cross flow turbine/Locally manufactured
  • Generator: A.C. Synchronous Generator/ Power 10 kW, 400 V, 50 Hz, 1500r/min, 3 phase



Pictures

Gobecho I waterfall.jpg
Gobecho I powerhouse.jpg
Gobecho I waterfall Gobecho I powerhouse
Gobecho I weir and intake.jpg
Turbine Generator for GOB I.JPG
Gobecho I weir and intake Gobecho I turbine
During Gob I testing.JPG
Gobecho I MHP ELC.JPG
During Gobecho I testing Gobecho I
Peoples enjoying in GOB I byTape recorder.JPG
Gob I grid and Street Light.JPG
People enjoying the benefits of electricity supplied by the MHP Gobecho I grid