Difference between revisions of "Micro Hydro Power (MHP) - Ethiopia, Gobecho I"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 1: Line 1:
 
'''Location of the site: '''<br>
 
'''Location of the site: '''<br>
  
*<u>Country:</u> Ethiopia
+
*<u>Country:</u> Ethiopia  
 
*<u>District</u>: Bona Zuria  
 
*<u>District</u>: Bona Zuria  
*<u>GPS&nbsp;Coordinates:</u> 6º34’40’’N 38º41’50.3’’ E <br>
+
*<u>[[GPS_coordinates_-_MHP_sites_EnDev|GPS&nbsp;Coordinates]]:</u> 6º34’40’’N 38º41’50.3’’ E <br>
  
 
'''Start of construction:''' at the beginning of 2009<br>
 
'''Start of construction:''' at the beginning of 2009<br>
Line 37: Line 37:
 
{| class="FCK__ShowTableBorders" cellspacing="1" cellpadding="1" width="100%" border="0"
 
{| class="FCK__ShowTableBorders" cellspacing="1" cellpadding="1" width="100%" border="0"
 
|-
 
|-
| [[Image:Gob I grid and Street Light.JPG|thumb|left|267x200px|Gob I grid and Street Light.JPG]]
+
| [[Image:Gob I grid and Street Light.JPG|thumb|left|267x200px|Gob I grid and Street Light.JPG]]  
 
| [[Image:Turbine Generator for GOB I.JPG|thumb|center|248x186px|Turbine Generator for GOB I.JPG]]
 
| [[Image:Turbine Generator for GOB I.JPG|thumb|center|248x186px|Turbine Generator for GOB I.JPG]]
 
|-
 
|-
| [[Image:During Gob I testing.JPG|thumb|left|248x186px|During Gob I testing.JPG]]
+
| [[Image:During Gob I testing.JPG|thumb|left|248x186px|During Gob I testing.JPG]]  
 
| [[Image:Gobecho I MHP ELC.JPG|thumb|center|267x200px|Gobecho I MHP ELC.JPG]]
 
| [[Image:Gobecho I MHP ELC.JPG|thumb|center|267x200px|Gobecho I MHP ELC.JPG]]
 
|-
 
|-
| [[Image:Peoples enjoying in GOB I byTape recorder.JPG|thumb|right|248x186px|Peoples enjoying in GOB I byTape recorder.JPG]]
+
| [[Image:Peoples enjoying in GOB I byTape recorder.JPG|thumb|right|248x186px|Peoples enjoying in GOB I byTape recorder.JPG]]  
 
|  
 
|  
 
|}
 
|}

Revision as of 13:00, 21 March 2011

Location of the site:

  • Country: Ethiopia
  • District: Bona Zuria
  • GPS Coordinates: 6º34’40’’N 38º41’50.3’’ E

Start of construction: at the beginning of 2009


Date of Commissioning: 26 Feb. 2010


Ownership / Operation Modell:

Gobecho Genet Electric users cooperative/Community based cooperative Society


Tariff structure:

Flat rate/monthly based per appliance


Turbine:

T-3 Cross flow turbine/Locally manufactured


Generator:

A.C. Synchronous Generator/ Power 10kW, 400v, 50hz, 1500r/min, 3 phase

Gob I grid and Street Light.JPG
Turbine Generator for GOB I.JPG
During Gob I testing.JPG
Gobecho I MHP ELC.JPG
Peoples enjoying in GOB I byTape recorder.JPG


Pictures and comments to be put here.