*<u>Country</u>: Ethiopia  
 
*<u>Country</u>: Ethiopia  
*<u>District</u>: Bona<br>  
+
*<u>District</u>: Bona<br>
*<u>River</u>: Gange<br>  
+
*<u>River</u>: Gange<br>
 
*[[GPS coordinates - MHP sites EnDev|<u>GPS Coordinates</u>]]:&nbsp; 6º34’39.7’’N 38º41’50’’E
 
*[[GPS coordinates - MHP sites EnDev|<u>GPS Coordinates</u>]]:&nbsp; 6º34’39.7’’N 38º41’50’’E
  
<br>  
+
<br>
  
The MHP power plant Gobecho II has a capacity of 34 kW and <span style="color: rgb(255, 0, 0);">is planned to be inaugurated in June 2011.</span> Current estimations show that approximately 200 households will be connected to the plant. The maximum number of households that could be supplied is estimated to be 700 (given that no public facilities such as schools and health centers are connected).  
+
The MHP power plant Gobecho II has a capacity of 34 kW and <span style="color: rgb(255,0,0)">is planned to be inaugurated in June 2011.</span> Current estimations show that approximately 200 households will be connected to the plant. The maximum number of households that could be supplied is estimated to be 700 (given that no public facilities such as schools and health centers are connected).  
  
'''<br>'''  
+
'''<br>'''
  
'''Start of construction: 22/09/2009<br>'''  
+
'''Start of construction: 22/09/2009<br>'''
  
'''Date of Commissioning: <br>'''  
+
'''Date of Commissioning: <br>'''
  
<br> '''Ownership / Operation Modell:'''Gobecho Genet Electric Users Cooperative/community based cooperative society'''<br>'''  
+
<br>'''Ownership / Operation Modell: '''Gobecho Genet Electric Users Cooperative/community based cooperative society'''<br>'''
  
'''Tariff structure:'''Flat rate/monthly based per appliance '''<br>'''  
+
'''Tariff structure: '''Flat rate/monthly based per appliance '''<br>'''
  
<br> '''Turbine:'''Cross- flow T14 D300 HeksaHydro, Efficiency --76%'''<br>'''  
+
<br>'''Turbine: '''Cross- flow T14 D300 HeksaHydro, Efficiency --76%'''<br>'''
  
'''Generator:'''Synchronous Alternator, 1450rpm, 60KVA, 3 phase, cos phi - 0.8, 50 HZ, insulation class-F, Brand Matari, origin China<br>
+
'''Generator: '''Synchronous Alternator, 1450rpm, 60KVA, 3 phase, cos phi - 0.8, 50 HZ, insulation class-F, Brand Matari, origin China
  
[[Image:Gobecho_II_Fall_(2).jpg|center|370x270px]]<br>
+
{| class="FCK__ShowTableBorders" cellspacing="1" cellpadding="1" width="100%" border="0"
 
 
{| cellspacing="1" cellpadding="1" border="0" width="100%"
 
 
|-
 
|-
 
| [[Image:Bild 261.jpg|276x368px|Bild 261.jpg]]  
 
| [[Image:Bild 261.jpg|276x368px|Bild 261.jpg]]  
| [[Image:Gobecho II powerhouse.jpg|488x367px|Gobecho II powerhouse.jpg]]
+
| [[Image:Gobecho II powerhouse.jpg|488x366px|Gobecho II powerhouse.jpg]]
 
|-
 
|-
 
| Gobecho II waterfall  
 
| Gobecho II waterfall  
 
| Gobecho II powerhouse (under construction)
 
| Gobecho II powerhouse (under construction)
 
|-
 
|-
| <br>
+
| &nbsp;
| <br>
+
| &nbsp; [[Image:Gobecho II Fall (2).jpg|left|370px|Gobecho II Fall (2).jpg]]
 
|-
 
|-
| <br>
+
|  
| <br>
+
| Gobecho II waterfall
 
|}
 
|}
  
&nbsp;
+
 
  
 
[[Category:Ethiopia]] [[Category:Hydro]]
 
[[Category:Ethiopia]] [[Category:Hydro]]

Revision as of 06:59, 2 August 2011

Location of the site:

  • Country: Ethiopia
  • District: Bona
  • River: Gange
  • GPS Coordinates:  6º34’39.7’’N 38º41’50’’E


The MHP power plant Gobecho II has a capacity of 34 kW and is planned to be inaugurated in June 2011. Current estimations show that approximately 200 households will be connected to the plant. The maximum number of households that could be supplied is estimated to be 700 (given that no public facilities such as schools and health centers are connected).


Start of construction: 22/09/2009

Date of Commissioning:


Ownership / Operation Modell: Gobecho Genet Electric Users Cooperative/community based cooperative society

Tariff structure: Flat rate/monthly based per appliance


Turbine: Cross- flow T14 D300 HeksaHydro, Efficiency --76%

Generator: Synchronous Alternator, 1450rpm, 60KVA, 3 phase, cos phi - 0.8, 50 HZ, insulation class-F, Brand Matari, origin China

Bild 261.jpg Gobecho II powerhouse.jpg
Gobecho II waterfall Gobecho II powerhouse (under construction)
   
Gobecho II Fall (2).jpg
Gobecho II waterfall