Difference between revisions of "Micro Hydro Power (MHP) - Ethiopia, Gobecho II"
***** (***** | *****) |
***** (***** | *****) m |
||
Line 1: | Line 1: | ||
− | '''Location of the site:''' | + | '''Location of the site:''' |
− | *<u>Country</u>: Ethiopia | + | *<u>Country</u>: Ethiopia |
− | *<u>District</u>: Bona | + | *<u>District</u>: Bona |
− | *<u>River</u>: Gange | + | *<u>River</u>: Gange |
*[[GPS coordinates - MHP sites EnDev|<u>GPS Coordinates</u>]]: 6º34’39.7’’N 38º41’50’’E | *[[GPS coordinates - MHP sites EnDev|<u>GPS Coordinates</u>]]: 6º34’39.7’’N 38º41’50’’E | ||
− | |||
− | |||
− | + | The MHP power plant Gobecho II has a capacity of 34 kW and is planned to be inaugurated in September 2011. Current estimations show that approximately 200 households will be connected to the plant. The maximum number of households that could be supplied is estimated to be 700 (given that no public facilities such as schools and health centers are connected). | |
− | + | For more information click [[:file:Fact sheet Gobecho.pdf|here]]. | |
− | |||
− | |||
− | + | '''Start of construction: 22/09/2009''' | |
− | ''' | + | '''Date of Commissioning:''' |
− | <br>''' | + | <br/>'''Ownership / Operation Modell: '''Gobecho Genet Electric Users Cooperative/community based cooperative society |
− | ''' | + | '''Tariff structure: '''Flat rate/monthly based per appliance |
− | {| | + | <br/>'''Turbine: '''Cross- flow T14 D300 HeksaHydro, Efficiency --76% |
+ | |||
+ | '''Generator: '''Synchronous Alternator, 1450rpm, 60kVA, 3 phase, cos phi - 0.8, 50 Hz, insulation class-F, Brand Matari, origin China | ||
+ | |||
+ | {| class="FCK__ShowTableBorders" width="100%" border="0" cellpadding="1" cellspacing="1" | ||
|- | |- | ||
− | | [[ | + | | [[File:Bild 261.jpg|276x368px|Bild 261.jpg]] |
− | | [[ | + | | [[File:Gobecho II powerhouse.jpg|488x366px|Gobecho II powerhouse.jpg]] |
|- | |- | ||
− | | Gobecho II waterfall | + | | Gobecho II waterfall |
| Gobecho II powerhouse (under construction) | | Gobecho II powerhouse (under construction) | ||
|- | |- | ||
− | | | + | | |
− | | [[ | + | | [[File:Gobecho II Fall (2).jpg|left|370px|Gobecho II Fall (2).jpg]] |
|- | |- | ||
| | | | ||
− | | Gobecho II waterfall | + | | Gobecho II waterfall<br/> |
|} | |} | ||
− | + | [[Category:Hydro]] |
Revision as of 15:29, 30 August 2011
Location of the site:
- Country: Ethiopia
- District: Bona
- River: Gange
- GPS Coordinates: 6º34’39.7’’N 38º41’50’’E
The MHP power plant Gobecho II has a capacity of 34 kW and is planned to be inaugurated in September 2011. Current estimations show that approximately 200 households will be connected to the plant. The maximum number of households that could be supplied is estimated to be 700 (given that no public facilities such as schools and health centers are connected).
For more information click here.
Start of construction: 22/09/2009
Date of Commissioning:
Ownership / Operation Modell: Gobecho Genet Electric Users Cooperative/community based cooperative society
Tariff structure: Flat rate/monthly based per appliance
Turbine: Cross- flow T14 D300 HeksaHydro, Efficiency --76%
Generator: Synchronous Alternator, 1450rpm, 60kVA, 3 phase, cos phi - 0.8, 50 Hz, insulation class-F, Brand Matari, origin China
Gobecho II waterfall | Gobecho II powerhouse (under construction) |
Gobecho II waterfall |