'''Generator: '''Synchronous Alternator, 1450rpm, 60kVA, 3 phase, cos phi - 0.8, 50 Hz, insulation class-F, Brand Matari, origin China
 
'''Generator: '''Synchronous Alternator, 1450rpm, 60kVA, 3 phase, cos phi - 0.8, 50 Hz, insulation class-F, Brand Matari, origin China
  
 
+
<br/>
  
 
= Pictures =
 
= Pictures =
  
{| cellspacing="1" cellpadding="1" border="0" style="width: 100%" class="FCK__ShowTableBorders"
+
{| cellspacing="1" cellpadding="1" border="0" class="FCK__ShowTableBorders" style="width: 100%"
 
|-
 
|-
| [[File:Bild 261.jpg|Bild 261.jpg|alt=Bild 261.jpg]]
+
| [[File:Bild 261.jpg|none|200px|Bild 261.jpg|alt=Bild 261.jpg]]
| [[File:Gobecho II powerhouse.jpg|Gobecho II powerhouse.jpg|alt=Gobecho II powerhouse.jpg]]
+
| [[File:Gobecho II powerhouse.jpg|none|200px|Gobecho II powerhouse.jpg|alt=Gobecho II powerhouse.jpg]]
 
|-
 
|-
 
| Gobecho II waterfall
 
| Gobecho II waterfall
Line 49: Line 49:
 
|}
 
|}
  
 
+
<br/>
  
 
= Further Information =
 
= Further Information =
Line 57: Line 57:
 
<references />
 
<references />
  
 +
[[Category:Ethiopia]]
 +
[[Category:Micro_Hydro]]
 
[[Category:Hydro]]
 
[[Category:Hydro]]
[[Category:Micro_Hydro]]
 
[[Category:Ethiopia]]
 

Revision as of 15:05, 25 July 2013

Overview

Location of the site:

  • Country: Ethiopia
  • District: Bona
  • River: Gange
  • GPS Coordinates: 6º34’39.7’’N 38º41’50’’E


Details

The MHP power plant Gobecho II has a capacity of 34 kW and is planned to be inaugurated in September 2011. Current estimations show that approximately 200 households will be connected to the plant. The maximum number of households that could be supplied is estimated to be 700 (given that no public facilities such as schools and health centers are connected).

For more information click here.


Start of construction: 22/09/2009

Date of Commissioning:


Ownership / Operation Modell: Gobecho Genet Electric Users Cooperative/community based cooperative society

Tariff structure: Flat rate/monthly based per appliance


Turbine: Cross- flow T14 D300 HeksaHydro, Efficiency --76%

Generator: Synchronous Alternator, 1450rpm, 60kVA, 3 phase, cos phi - 0.8, 50 Hz, insulation class-F, Brand Matari, origin China


Pictures

Bild 261.jpg
Gobecho II powerhouse.jpg
Gobecho II waterfall Gobecho II powerhouse (under construction)
Gobecho II Fall (2).jpg
Gobecho II waterfall


Further Information

References