'''Location of the site:'''  
+
'''Location of the site:'''
  
*<u>Country</u>: Ethiopia  
+
*<u>Country</u>: Ethiopia
*<u>District</u>: Aleto Wendo<br>
+
*<u>District</u>: Aleto Wendo
*<u>River</u>: Lalta  
+
*<u>River</u>: Lalta
 
*[[GPS coordinates - MHP sites EnDev|<u>GPS Coordinates</u>]]: 6º37’26.6’’N 38º31’5.3’’ E
 
*[[GPS coordinates - MHP sites EnDev|<u>GPS Coordinates</u>]]: 6º37’26.6’’N 38º31’5.3’’ E
  
<br>
 
  
The MHP power plant Hagara Sodicha has a capacity of 55 kW and is planned to be inaugurated in September 2011. The plant is estimated to supply 300 to 400 households with electricity (maximum number of connectable households is 1000, considering no public facilities are connected).
 
  
<br>
+
The MHP power plant Hagara Sodicha has a capacity of 55 kW and is planned to be inaugurated in September 2011. The plant is estimated to supply 300 to 400 households with electricity (maximum number of connectable households is 1000, considering no public facilities are connected).
  
'''Start of construction:''' May 2009
 
  
'''Date of Commissioning:'''
 
  
'''<br>Ownership / Operation Modell:'''  
+
'''Start of construction:''' May 2009
  
'''Tariff structure: '''Flat rate/monthly based per appliance
+
'''Date of Commissioning:'''
  
'''<br>Turbine: '''X-flow T -14 D300 HEKSAHYDRO, Rated head - 43.2 m, Rated discharge - 0.2 m3/s
+
<br/>'''Ownership / Operation Modell:'''
  
'''Generator:'''&nbsp;MARELLI, Brushless Synchronous 4 poles , 3 phase series STAR connection, 1500 rpm, 73KVA,58KW, 50 HZ, 380/440V, Excitation current-2.4A<br>
+
'''Tariff structure: '''Flat rate/monthly based per appliance
  
'''&nbsp;Control system type, Rating voltage &amp; connection''': HEKSAHYDRO, ELC MC-1 with Two step Ballast Load,&nbsp;58kW, 73KVA @0.8 cos phi, 380/440v line to line,50Hz
+
<br/>'''Turbine: '''X-flow T -14 D300 HEKSAHYDRO, Rated head - 43.2 m, Rated discharge - 0.2 m3/s
  
'''Standard metering''': Volt, Amp, frequency and hour meter<br>'''Ballast load type''': Baker Unfinned Tubular Air heater,3x(6x3kW), 3 phase STAR connection, 240volt,50Hz<br><br>
+
'''Generator:'''&nbsp;MARELLI, Brushless Synchronous 4 poles , 3 phase series STAR connection, 1500 rpm, 73 kVA,58 kW, 50 Hz, 380/440V, Excitation current-2.4 A
  
{| cellspacing="1" cellpadding="1" border="1" width="100%"
+
'''&nbsp;Control system type, Rating voltage & connection''': HEKSAHYDRO, ELC MC-1 with Two step Ballast Load,&nbsp;58 kW, 73 kVA @0.8 cos phi, 380/440 V line to line,50 Hz
 +
 
 +
'''Standard metering''': Volt, Amp, frequency and hour meter<br/>'''Ballast load type''': Baker Unfinned Tubular Air heater,3x(6x3 kW), 3 phase STAR connection, 240 V,50 Hz<br/>
 +
 
 +
{| width="100%" border="1" cellpadding="1" cellspacing="1"
 
|-
 
|-
 
|  
 
|  
 
|}
 
|}
  
{| cellspacing="1" cellpadding="1" border="0" width="100%" class="FCK__ShowTableBorders"
+
{| class="FCK__ShowTableBorders" width="100%" border="0" cellpadding="1" cellspacing="1"
 
|-
 
|-
 
|  
 
|  
[[Image:Hagras Sodicha MHP canaland diversion.JPG|left|370px|Hagras Sodicha MHP canaland diversion.JPG]]  
+
[[File:Hagras Sodicha MHP canaland diversion.JPG|left|370px|Hagras Sodicha MHP canaland diversion.JPG]]
  
| [[Image:Hagara Kija community Participation.JPG|left|370px|Hagara Kija community Participation.JPG]]
+
| [[File:Hagara Kija community Participation.JPG|left|370px|Hagara Kija community Participation.JPG]]
 
|-
 
|-
| Hagras Sodicha MHP canaland diversion  
+
| Hagras Sodicha MHP canaland diversion
 
| Hagara Kija community participation
 
| Hagara Kija community participation
 
|-
 
|-
| [[Image:Hagara Sodicha Fall.JPG|left|220x293px|Hagara Sodicha Fall.JPG]]  
+
| [[File:Hagara Sodicha Fall.JPG|left|220x293px|Hagara Sodicha Fall.JPG]]
 
|  
 
|  
 
|-
 
|-
| Hagara Sodicha Waterfall  
+
| Hagara Sodicha Waterfall
 
|  
 
|  
 
|}
 
|}
  
&nbsp;  
+
&nbsp;
 
 
&nbsp;&nbsp;&nbsp;&nbsp; <br>
 
  
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;  
+
&nbsp;&nbsp;&nbsp;&nbsp;
  
<br>
+
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
  
[[Category:Ethiopia]] [[Category:Hydro]]
+
[[Category:Hydro]]

Revision as of 15:31, 30 August 2011

Location of the site:

  • Country: Ethiopia
  • District: Aleto Wendo
  • River: Lalta
  • GPS Coordinates: 6º37’26.6’’N 38º31’5.3’’ E


The MHP power plant Hagara Sodicha has a capacity of 55 kW and is planned to be inaugurated in September 2011. The plant is estimated to supply 300 to 400 households with electricity (maximum number of connectable households is 1000, considering no public facilities are connected).


Start of construction: May 2009

Date of Commissioning:


Ownership / Operation Modell:

Tariff structure: Flat rate/monthly based per appliance


Turbine: X-flow T -14 D300 HEKSAHYDRO, Rated head - 43.2 m, Rated discharge - 0.2 m3/s

Generator: MARELLI, Brushless Synchronous 4 poles , 3 phase series STAR connection, 1500 rpm, 73 kVA,58 kW, 50 Hz, 380/440V, Excitation current-2.4 A

 Control system type, Rating voltage & connection: HEKSAHYDRO, ELC MC-1 with Two step Ballast Load, 58 kW, 73 kVA @0.8 cos phi, 380/440 V line to line,50 Hz

Standard metering: Volt, Amp, frequency and hour meter
Ballast load type: Baker Unfinned Tubular Air heater,3x(6x3 kW), 3 phase STAR connection, 240 V,50 Hz

Hagras Sodicha MHP canaland diversion.JPG
Hagara Kija community Participation.JPG
Hagras Sodicha MHP canaland diversion Hagara Kija community participation
Hagara Sodicha Fall.JPG
Hagara Sodicha Waterfall