Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "PV-Diesel Hybrid Mini-Grid"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
Line 25: Line 25:
  
 
The 16 systems have a total PV capacity of 81.6 kW<sub>p</sub> and can generate 106.9 MWh per year. Electricity generation by the diesel generator is not included in this calculation.
 
The 16 systems have a total PV capacity of 81.6 kW<sub>p</sub> and can generate 106.9 MWh per year. Electricity generation by the diesel generator is not included in this calculation.
 +
  
  
Line 34: Line 35:
 
*[[Portal:Solar|Solar portal on energypedia]]<br/>
 
*[[Portal:Solar|Solar portal on energypedia]]<br/>
 
*[[Portal:Grid|Grid portal on energypedia]]<br/>
 
*[[Portal:Grid|Grid portal on energypedia]]<br/>
 +
*[https://energypedia.info/images/0/0f/Mini-Grid_Sizing_Guidebook.pdf Mini-Grid load assessment and system sizing handbook]
  
 
<br/>
 
<br/>
 +
  
 
= References =
 
= References =

Revision as of 11:52, 6 September 2016

Overview

One possibility to avoid high storage costs is to use the solar electricity only during daytime, with a small battery system for peak demands. At night or during rainy days the electricity is generated by the Diesel generator.


Experiences in Senegal

-> Experience from EnDev.

In Senegal EnDev disseminates PV-diesel hybrid mini-grids for the electrification of villages with up to 500 inhabitants or 40 households.

The systems consist of (approximate total cost including installation in brackets):

  • a PV array with a capacity of 5.1 kWpconsisting of 30 polycrystalline PV modules with a capacity of 170 Wpeach (15,000 €)
  • a battery bank consisting of 24 elements of 2 V of lead-acid tubular plate batteries; element capacity is 800 Ah C10 leading to a bank capacity of 38,4 kWh (15,000 €)
  • a monophase generator of 10 kVA linked to the PV system (7000 €)
  • a 5000 VA inverter (4,000 €)
  • 220 Volts low voltage three phase AC distribution through a mini-grid (10,000 € per km; 2-3 km per village)
  • system housing (6,000 €).

The total costs of installing a system is between about 70,000 € and 80,000 €.


The 16 systems have a total PV capacity of 81.6 kWp and can generate 106.9 MWh per year. Electricity generation by the diesel generator is not included in this calculation.