Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Solar Mini-grid Installation in Indonesia"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
Line 1: Line 1:
 +
  
 
= Overview =
 
= Overview =
  
GIZ Indonesia, as part of EnDev Indonesia, has been supporting the sustainability of solar mini-grid (photovoltaic village power - PVVP) installations in Indonesia since 2013. As part of these efforts, capacity building initiatives for 'Village Management Team (VMT) are conducted, along with the distribution of a range of information materials (e.g. operator log book, treasurer cash book, etc). One such information material is an A0 full colour poster depicting, in the form of a flowchart, the basic operational troubleshooting steps that a PV-VP operator can perform.
+
GIZ Indonesia, as part of EnDev Indonesia, has been supporting the sustainability of solar mini-grid ([[Photovoltaic_(PV)|photovoltaic]] village power - PVVP) installations in Indonesia since 2013. As part of these efforts, capacity building initiatives for 'Village Management Team (VMT) are conducted, along with the distribution of a range of information materials (e.g. operator log book, treasurer cash book, etc). One such information material is an A0 full colour poster depicting, in the form of a flowchart, the basic operational troubleshooting steps that a PV-VP operator can perform.
  
 
<br/>The poster was designed in MSPowerPoint, in order to facilitate easy revision and translation. Current version is available in English and Bahasa Indonesia and can be dowloaded below.
 
<br/>The poster was designed in MSPowerPoint, in order to facilitate easy revision and translation. Current version is available in English and Bahasa Indonesia and can be dowloaded below.
Line 11: Line 12:
  
 
<br/>
 
<br/>
*The picture below shows field surveyors explaining the PV-VP troubleshooting poster to the operators at a solar mini-grid in Papua Barat, Indonesia (EnDev Indonesia, 2013)<br/>
+
*The picture below shows field surveyors explaining the PV-VP troubleshooting poster to the operators at a solar [[Portal:Grid|mini-grid]] in Papua Barat, Indonesia (EnDev Indonesia, 2013)<br/>
  
 
<br/>
 
<br/>
Line 18: Line 19:
  
 
<br/>
 
<br/>
 +
  
 
= <span id="further_information" class="mw-headline">Further Information</span> =
 
= <span id="further_information" class="mw-headline">Further Information</span> =

Revision as of 12:38, 18 July 2014


Overview

GIZ Indonesia, as part of EnDev Indonesia, has been supporting the sustainability of solar mini-grid (photovoltaic village power - PVVP) installations in Indonesia since 2013. As part of these efforts, capacity building initiatives for 'Village Management Team (VMT) are conducted, along with the distribution of a range of information materials (e.g. operator log book, treasurer cash book, etc). One such information material is an A0 full colour poster depicting, in the form of a flowchart, the basic operational troubleshooting steps that a PV-VP operator can perform.


The poster was designed in MSPowerPoint, in order to facilitate easy revision and translation. Current version is available in English and Bahasa Indonesia and can be dowloaded below.


Solar Mini-grid Troubleshooting Poster for Operators in Indonesia



  • The picture below shows field surveyors explaining the PV-VP troubleshooting poster to the operators at a solar mini-grid in Papua Barat, Indonesia (EnDev Indonesia, 2013)


Training the PVVP operator in Papua (EnDev Indonesia 2013).jpg




Further Information


References