Difference between revisions of "Solar Pumping Toolkit - Installation and O&M"

From energypedia
***** (***** | *****)
***** (***** | *****)
m
 
(10 intermediate revisions by 2 users not shown)
Line 6: Line 6:
 
As such it is important that if possible, service agreements are established prior to any installation, and renewed as years pass by, with a quality private contractor, water utility, water service provider of relevant government technical office. The possibility to remotely operate and monitor solar pumping schemes could also be considered in certain contexts as a way to reinforce preventive maintenance.<br/>
 
As such it is important that if possible, service agreements are established prior to any installation, and renewed as years pass by, with a quality private contractor, water utility, water service provider of relevant government technical office. The possibility to remotely operate and monitor solar pumping schemes could also be considered in certain contexts as a way to reinforce preventive maintenance.<br/>
  
= PHYSICAL INSTALLATION and MAINTENANCE CHECKLISTs<br/> =
+
= <span style="color:#66cc66">PHYSICAL INSTALLATION and MAINTENANCE CHECKLISTs</span><br/> =
 +
 
 +
*'''[[:File:Installation Control Checklist.pdf|PDF: Installation Control Checklist]]'''
  
 
In order to get a good quality solar pumping installation, monitoring the field work carried out by the private contractor selected is of paramount importance. It is therefore strongly recommended to WASH officers to follow up as much as possible the below list of actions.
 
In order to get a good quality solar pumping installation, monitoring the field work carried out by the private contractor selected is of paramount importance. It is therefore strongly recommended to WASH officers to follow up as much as possible the below list of actions.
Line 17: Line 19:
 
#Finally inspect civil works (castle, basin, trough, fixing the solar supports ...), piping, valves and all other important elements that can compromise the sound operation of the system<br/>
 
#Finally inspect civil works (castle, basin, trough, fixing the solar supports ...), piping, valves and all other important elements that can compromise the sound operation of the system<br/>
  
PDF: Installation Control Checklist
+
<br/>
 +
 
 +
= <span style="color:#66cc66">O&M TOOLKIT FOR COMMUNITIES: SOLAR POWERED WATER SUPPLY SYSTEMS</span><br/> =
 +
 
 +
*'''[[:File:O M Toolkit for Communities.pdf|Download the toolkit for communities as PDF here]]'''
 +
 
 +
== Installation ==
 +
 
 +
This section of the toolkit outlines the things that community users should look out for during the set-up of solar-water pumping systems. Committee members and scheme operators are encouraged to work with system installers and donating agencies to ensure the five measures below are adhered to.
 +
 
 +
<br/>
 +
 
 +
[[File:Install 01.PNG|thumb|center|650px|Installation: Step 01]]<br/>
 +
 
 +
[[File:Install 02.PNG|thumb|center|650px|Installation: Step 02]]<br/>
 +
 
 +
[[File:Install 03.PNG|thumb|center|650px|Installation: Step 03]]<br/>
 +
 
 +
[[File:Install 04.PNG|thumb|center|650px|Installation: Step 04]]<br/>
 +
 
 +
[[File:Install 05.PNG|thumb|center|650px|Installation: Step 05]]<br/>
 +
 
 +
== Operation & Maintenance ==
 +
 
 +
This section of the toolkit details the steps that the scheme operator and the water point committee members should to take to ensure that the system is running efficiently.
 +
 
 +
<br/>
 +
 
 +
[[File:Op & M 01.PNG|thumb|center|650px|Operation & Maintenance: Step 01]]<br/>
 +
 
 +
[[File:Op & M 02.PNG|thumb|center|650px|Operation & Maintenance: Step 02]]<br/>
 +
 
 +
[[File:Op & M 03.PNG|thumb|center|650px|Operation & Maintenance: Step 03]]<br/>
 +
 
 +
[[File:Op & M 04.PNG|thumb|center|650px|Operation & Maintenance: Step 04]]<br/>
 +
 
 +
When to call a technician<br/>
 +
 
 +
*When the pump is making unusual noises.<br/>
 +
*When there is any change in the rate of pumping- The system is pumping less water than it used to yet the solar panels are clean.<br/>
 +
*When a bi-annual maintenance check needs to be performed.<br/>
 +
 
 +
<br/>
 +
 
 +
== Financial Management<br/> ==
 +
 
 +
This section details the prices of various solar powered water system components and demonstrates why water point leadership must ensure that they are collecting and saving water fees. Failure to collect adequate money from the community will mean that if a system component fails the committee will be unable to replace it resulting in extended periods of non-functionality (no water access).<br/>
 +
 
 +
<br/>
 +
 
 +
[[File:Solar Powered Water System Components.PNG|thumb|center|650px|Solar Powered Water System Components]]<br/>
 +
 
 +
{| style="width:100%" cellspacing="0" cellpadding="1" border="1"
 +
|-
 +
! scope="col" | Prices of system components: why you MUST have water point savings <ref>These are estimated values for a system with 130m total dynamic head and a yield of 8m 3/ hr. System Component costs normally depend on the size of the array as well as the type of pump used.</ref>
 +
|-
 +
|
 +
*A.Solar Array - app. KES 120 per Watt e.g. replacing a panel of 250W costs 30,000<br/>
 +
*B.Inverter Controller - > Kshs 100,000<br/>
 +
*C.Submersible Pump- Kshs 350,000
 +
*Labour- Kshs 100,000
 +
 
 +
|}
 +
 
 +
<br/>
 +
 
 +
{| style="width:100%" cellspacing="0" cellpadding="1" border="1"
 +
|-
 +
! scope="col" | Why make sure you are collecting and saving water fees?<br/>
 +
|-
 +
|
 +
*&nbsp;Replacement of system parts can be done
 +
*Regular Maintenance on the system can be conducted
 +
*Scheme Operators and other labourer like night guards can be paid
 +
*Funds for community projects
 +
 
 +
|}
  
= O&M TOOLKIT FOR COMMUNITIES: SOLAR POWERED WATER SUPPLY SYSTEMS<br/> =
+
<references /><br/>[[File:Fin Man 01.PNG|thumb|center|650px|Financial Management: Advice 01]]
  
== Installation  ==
+
[[File:Fin Man 02.PNG|thumb|center|650px|Financial Management: Advice 02]]<br/>
  
This section of the toolkit outlines the things that community users should look out for during the set-up of solar-water pumping systems. Committee members and scheme operators are encouraged to work with system installers and donating agencies to ensure the five measures below are adhered to.
+
== Checklist and Important Numbers ==
  
#Exposed Control Box: The control box SHOULD be safely mounted onto a solid structure, with all its wires insulated.
+
This section highlights the required documents and necessary numbers that scheme operators and committee members MUST maintain.
#Exposed Wires: Electricity wires MUST be insulated at all times; wires should not be exposed. In case exposure, contact an electrician.
 
#Mounting of solar panels: Ensure solar panels are properly secured on to an appropriate mounting frame with enough reinforcement to mitigate the risk of theft and strong winds blowing off panels. In case of loose mounting, contact a welder to reinforce the installation.
 
#Completed Name Plates: Ensure system details are displayed on the borehole name plate. This information is important, especially, in case of need for pump repair or replacement.
 
#Unsecured Solar Panels: System Components including solar panels, the pump and storage tanks MUST be safely secured by a lockable fence manned by a security guard at night.  
 
  
== Operation & Maintenance  ==
+
Important Telephone Numbers
  
This section of the toolkit details the steps that the scheme operator and the water point committee members should to take to ensure that the system is running efficiently.
+
*Installation Technician________________________________
 +
*Certified PV Installer_________________________________
 +
*Certified Pump Expert________________________________
  
#Regular Cleaning of Solar Panels: Regularly clean the panels to remove accumulated dust and other debris like bird droppings. This will improve the rate of pumping. Cleaning should be done with a soft sponge, and water. DO NOT USE SOAP. Cleaning should be more regular during the dry season.
+
Important Documents
#Trimming of trees: Trees around the solar panels should be regularly trimmed to ensure that they do not give a shadow that blocks the panels from receiving maximum sunlight.
 
#Overflowing Tank: If the tank does not have a valve to cut off water supply when it gets full, the system operator should shut down the pump as soon as the tank is full to prevent overflows.
 
#Clearing the area around the borehole and Solar Panels: The compound where the solar panels and pump are located should be kept clean and free of litter and debris. Any tall grass should be trimmed to deter theft and vandalism
 
  
When to call a technician
+
*Bank Account Registration Documents
 +
*Equipment Warranty Certificates
 +
*Equipment repair logs
 +
*Pumping log / register
 +
*Minutes of AGM meetings with the community
  
= References<br/> =
+
Important Training
  
*Contacts: [mailto:allario@iom.int Alberto Ibanez Llario] & [mailto:andegwa@oxfam.org Asenath Ndegwa]&nbsp; – The Global Solar & Water Initiative<br/>
+
*Financial Management Training
 +
*Systems Operation Training (The scheme operator and members of the committee should be trained on how to operate the system on a day to day basis) O&M Toolkit for Communities: SPWSS | April | 2018 Page 7 of 7<br/>
 +
<br/>
 +
&nbsp;{{GSWI}}
  
[[Category:Hidden_categories]]
+
[[Category:Tools]]
 +
[[Category:Solar_Pumping]]

Latest revision as of 11:03, 22 November 2018

Solar Pumping Toolkit - The Global Solar & Water Initiative

Overview

Solar powered water schemes will suffer fewer breakdowns and have much less intensive maintenance than generator or hand pump schemes. However solar powered schemes can and will experience problems at some point that cannot be solved at community level (or for which the managing NGO will probably need support), regardless of the training provided.

As such it is important that if possible, service agreements are established prior to any installation, and renewed as years pass by, with a quality private contractor, water utility, water service provider of relevant government technical office. The possibility to remotely operate and monitor solar pumping schemes could also be considered in certain contexts as a way to reinforce preventive maintenance.

PHYSICAL INSTALLATION and MAINTENANCE CHECKLISTs

In order to get a good quality solar pumping installation, monitoring the field work carried out by the private contractor selected is of paramount importance. It is therefore strongly recommended to WASH officers to follow up as much as possible the below list of actions.

Introduction: 4 steps

  1. Check the references of all components of the system to ensure that the installed components are those provided in the design.
  2. Check orientation and the inclination of the panels, and shadow on the Solar PV generator. The orientation and inclination values must be close enough to those that were determined during calculations sizing. The acceptable variations will be less than 5 ° for the inclination and 15 ° with respect to the geographic North- South orientation
  3. Check the cleanliness and protection of the wiring, and its compliance with the standards.
  4. Finally inspect civil works (castle, basin, trough, fixing the solar supports ...), piping, valves and all other important elements that can compromise the sound operation of the system


O&M TOOLKIT FOR COMMUNITIES: SOLAR POWERED WATER SUPPLY SYSTEMS

Installation

This section of the toolkit outlines the things that community users should look out for during the set-up of solar-water pumping systems. Committee members and scheme operators are encouraged to work with system installers and donating agencies to ensure the five measures below are adhered to.


Installation: Step 01


Installation: Step 02


Installation: Step 03


Installation: Step 04


Installation: Step 05


Operation & Maintenance

This section of the toolkit details the steps that the scheme operator and the water point committee members should to take to ensure that the system is running efficiently.


Operation & Maintenance: Step 01


Operation & Maintenance: Step 02


Operation & Maintenance: Step 03


Operation & Maintenance: Step 04


When to call a technician

  • When the pump is making unusual noises.
  • When there is any change in the rate of pumping- The system is pumping less water than it used to yet the solar panels are clean.
  • When a bi-annual maintenance check needs to be performed.


Financial Management

This section details the prices of various solar powered water system components and demonstrates why water point leadership must ensure that they are collecting and saving water fees. Failure to collect adequate money from the community will mean that if a system component fails the committee will be unable to replace it resulting in extended periods of non-functionality (no water access).


Solar Powered Water System Components


Prices of system components: why you MUST have water point savings [1]
  • A.Solar Array - app. KES 120 per Watt e.g. replacing a panel of 250W costs 30,000
  • B.Inverter Controller - > Kshs 100,000
  • C.Submersible Pump- Kshs 350,000
  • Labour- Kshs 100,000


Why make sure you are collecting and saving water fees?
  •  Replacement of system parts can be done
  • Regular Maintenance on the system can be conducted
  • Scheme Operators and other labourer like night guards can be paid
  • Funds for community projects
  1. These are estimated values for a system with 130m total dynamic head and a yield of 8m 3/ hr. System Component costs normally depend on the size of the array as well as the type of pump used.


Financial Management: Advice 01
Financial Management: Advice 02


Checklist and Important Numbers

This section highlights the required documents and necessary numbers that scheme operators and committee members MUST maintain.

Important Telephone Numbers

  • Installation Technician________________________________
  • Certified PV Installer_________________________________
  • Certified Pump Expert________________________________

Important Documents

  • Bank Account Registration Documents
  • Equipment Warranty Certificates
  • Equipment repair logs
  • Pumping log / register
  • Minutes of AGM meetings with the community

Important Training

  • Financial Management Training
  • Systems Operation Training (The scheme operator and members of the committee should be trained on how to operate the system on a day to day basis) O&M Toolkit for Communities: SPWSS | April | 2018 Page 7 of 7


 = Contacts =

Click here to come back to the Solar Pumping Toolkit