Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Tariffs and Billings Systems - Experience Matrix - MATA 2009"

From energypedia
***** (***** | *****)
m (New page: Results of the discussions during Mata 2009 about: = Which tariffs and billing systems have been successful? Which challenges have been identified? = {| width="98%" cellspacing="1" cellp...)
 
***** (***** | *****)
m
Line 1: Line 1:
Results of the discussions during Mata 2009 about:
+
Results of the discussions during Mata 2009 about:  
  
= Which tariffs and billing systems have been successful? Which challenges have been identified? =
+
= Which tariffs and billing systems have been successful? Which challenges have been identified? =
  
 
{| width="98%" cellspacing="1" cellpadding="7" border="1"
 
{| width="98%" cellspacing="1" cellpadding="7" border="1"
 
|-
 
|-
| '''Country/Project/System'''
+
| '''Country/Project/System'''  
| '''system applied successful'''
+
| '''system applied successful'''  
 
| '''Challenge'''
 
| '''Challenge'''
 
|-
 
|-
| Indonesia / MHP /Micro Hydro Schemes
+
| Indonesia / MHP /Micro Hydro Schemes  
 
|  
 
|  
Communal-set tariffs
+
Communal-set tariffs  
  
#Flat rate (households)
+
#Flat rate (households)  
#Item based (eg #of bulbs)
+
#Item based (eg #of bulbs)  
 
#Cluster metering
 
#Cluster metering
  
Line 20: Line 20:
  
 
|  
 
|  
*Overloading
+
*Overloading  
 
*Sanction management
 
*Sanction management
  
 
|-
 
|-
| Pakistan
+
| Pakistan  
| Item based (eg #of bulbs)
+
| Item based (eg #of bulbs)  
 
|  
 
|  
 
|-
 
|-
 +
| planned in Ethiopia / EnDev / Micro Hydro Schemes
 
|  
 
|  
|
+
*flat rate (no productive use) + mech.load limiter; only CLF, no social tariff
 +
 
 
|  
 
|  
 
|-
 
|-

Revision as of 11:13, 10 July 2009

Results of the discussions during Mata 2009 about:

Which tariffs and billing systems have been successful? Which challenges have been identified?

Country/Project/System system applied successful Challenge
Indonesia / MHP /Micro Hydro Schemes

Communal-set tariffs

  1. Flat rate (households)
  2. Item based (eg #of bulbs)
  3. Cluster metering

2.

  • Overloading
  • Sanction management
Pakistan Item based (eg #of bulbs)
planned in Ethiopia / EnDev / Micro Hydro Schemes
  • flat rate (no productive use) + mech.load limiter; only CLF, no social tariff