Difference between revisions of "Tariffs and Billings Systems - Experience Matrix - MATA 2009"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 28: Line 28:
 
|  
 
|  
 
|-
 
|-
| planned in Ethiopia / EnDev / Micro Hydro Schemes
+
| planned in Ethiopia / EnDev / Micro Hydro Schemes  
 
|  
 
|  
 
*flat rate (no productive use) + mech.load limiter; only CLF, no social tariff
 
*flat rate (no productive use) + mech.load limiter; only CLF, no social tariff
Line 98: Line 98:
 
|  
 
|  
 
|}
 
|}
 +
 +
[[Category:Subsidies and Financing]]

Revision as of 11:56, 10 July 2009

Results of the discussions during Mata 2009 about:

Which tariffs and billing systems have been successful? Which challenges have been identified?

Country/Project/System system applied successful Challenge
Indonesia / MHP /Micro Hydro Schemes

Communal-set tariffs

  1. Flat rate (households)
  2. Item based (eg #of bulbs)
  3. Cluster metering

2.

  • Overloading
  • Sanction management
Pakistan Item based (eg #of bulbs)
planned in Ethiopia / EnDev / Micro Hydro Schemes
  • flat rate (no productive use) + mech.load limiter; only CLF, no social tariff