Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Tariffs and Billings Systems - Experience Matrix - MATA 2009"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 5: Line 5:
 
{| width="98%" cellspacing="1" cellpadding="7" border="1"
 
{| width="98%" cellspacing="1" cellpadding="7" border="1"
 
|-
 
|-
| '''Country/Project/System'''  
+
| width="30%" | '''Country/Project/System'''  
| '''system applied successful'''  
+
| width="34%" | '''System applied successful'''  
| '''Challenge'''
+
| '''Challenges'''
 
|-
 
|-
| Indonesia / MHP /Micro Hydro Schemes  
+
| <u>'''Indonesia / MHP /Micro Hydro Schemes'''</u>
 
|  
 
|  
Communal-set tariffs  
+
*'''Communal-set tariffs'''
  
#Flat rate (households)  
+
#'''Flat rate''' (households)  
#Item based (eg #of bulbs)  
+
#'''Item based''' (eg # of bulbs)  
#Cluster metering
+
#'''Cluster metering'''
 
 
2.
 
  
 
|  
 
|  
Line 24: Line 22:
  
 
|-
 
|-
| Pakistan  
+
| <u>'''Pakistan'''</u>
| Item based (eg #of bulbs)  
+
|  
 +
*'''Item based '''(eg # of bulbs)
 +
 
 
|  
 
|  
 
|-
 
|-
| planned in Ethiopia / EnDev / Micro Hydro Schemes  
+
| planned in <u>'''Ethiopia / EnDev / Micro Hydro Schemes'''</u>
 
|  
 
|  
*flat rate (no productive use) + mech.load limiter; only CLF, no social tariff
+
*'''flat rate''' (no productive use) + mech.'''load limiter'''; only CLF, no social tariff
  
 
|  
 
|  
 +
*Expected challenges:
 +
 +
#billing - recovery rate too low
 +
#monitoring of applied devices
 +
#Static system
 +
 +
*risk: pilot --&gt; not cost covering
 +
 
|-
 
|-
 
|  
 
|  
 +
<u>'''Republic South Africa / SHS'''</u>
 +
 +
<u>'''Pakistan / SHS'''</u>
 +
 
|  
 
|  
 
|  
 
|  
 +
*'''Fee for service with pre-paid metering'''
 +
 +
#complete financial failure
 +
#conceptual design resulted in no ownership and caused vandalism, theft,...
 +
 
|-
 
|-
 +
| <u>'''Ghana / grid'''</u>
 
|  
 
|  
|
+
*'''Multi-level tariff'''
 +
 
 +
#'''prepaid''' and '''post paid metered'''
 +
#'''lifetime tariff'''
 +
 
 
|  
 
|  
 
|-
 
|-

Revision as of 08:40, 13 July 2009

Results of the discussions during Mata 2009 about:

Which tariffs and billing systems have been successful? Which challenges have been identified?

Country/Project/System System applied successful Challenges
Indonesia / MHP /Micro Hydro Schemes
  • Communal-set tariffs
  1. Flat rate (households)
  2. Item based (eg # of bulbs)
  3. Cluster metering
  • Overloading
  • Sanction management
Pakistan
  • Item based (eg # of bulbs)
planned in Ethiopia / EnDev / Micro Hydro Schemes
  • flat rate (no productive use) + mech.load limiter; only CLF, no social tariff
  • Expected challenges:
  1. billing - recovery rate too low
  2. monitoring of applied devices
  3. Static system
  • risk: pilot --> not cost covering

Republic South Africa / SHS

Pakistan / SHS

  • Fee for service with pre-paid metering
  1. complete financial failure
  2. conceptual design resulted in no ownership and caused vandalism, theft,...
Ghana / grid
  • Multi-level tariff
  1. prepaid and post paid metered
  2. lifetime tariff