<p>Results of the discussions during Mata 2009 about:
+
Results of the discussions during Mata 2009 about:  
</p>
 
<h1> Which tariffs and billing systems have been successful? Which challenges have been identified?  </h1>
 
<table width="98%" cellspacing="1" cellpadding="7" border="1">
 
  
<tr>
+
= Which tariffs and billing systems have been successful? Which challenges have been identified?  =
<td width="30%"> <b>Country/Project/System</b>
+
 
</td><td width="34%"> <b>System applied successful</b>
+
{| cellspacing="1" cellpadding="7" width="98%" border="1"
</td><td> <b>Challenges</b>
+
|-
</td></tr>
+
| width="30%" | '''Country/Project/System'''
<tr>
+
| width="34%" | '''System applied successful'''
<td> <u><b>Indonesia / MHP /Micro Hydro Schemes</b></u>
+
| '''Challenges'''
</td><td>
+
|-
<ul><li><b>Communal-set tariffs</b>
+
| <u>'''Indonesia / MHP /Micro Hydro Schemes'''</u>  
</li></ul>
+
|
<ol><li><b>Flat rate</b> (households)
+
*'''Communal-set tariffs'''
</li><li><b>Item based</b> (eg # of bulbs)
+
 
</li><li><b>Cluster metering</b>
+
#'''Flat rate''' (households)  
</li></ol>
+
#'''Item based''' (eg # of bulbs)  
</td><td>
+
#'''Cluster metering'''
<ul><li>Overloading
+
 
</li><li>Sanction management
+
|
</li></ul>
+
*Overloading  
</td></tr>
+
*Sanction management
<tr>
+
 
<td> <u><b>Pakistan</b></u>
+
|-
</td><td>
+
| <u>'''Pakistan'''</u>  
<ul><li><b>Item based </b>(eg # of bulbs)
+
|
</li></ul>
+
*'''Item based '''(eg # of bulbs)
</td><td>
+
 
</td></tr>
+
|
<tr>
+
|-
<td> planned in <u><b>Ethiopia / EnDev / Micro Hydro Schemes</b></u>
+
| planned in <u>'''Ethiopia / EnDev / Micro Hydro Schemes'''</u>  
</td><td>
+
|
<ul><li><b>flat rate</b> (no productive use) + mech.<b>load limiter</b>; only CLF, no social tariff
+
*'''flat rate''' (no productive use) + mech.'''load limiter'''; only CLF, no social tariff
</li></ul>
+
 
</td><td>
+
|
<ul><li>Expected challenges:
+
*Expected challenges:
</li></ul>
+
 
<ol><li>billing - recovery rate too low
+
#billing - recovery rate too low  
</li><li>monitoring of applied devices
+
#monitoring of applied devices  
</li><li>Static system
+
#Static system
</li></ol>
+
 
<ul><li>risk: pilot --&gt; not cost covering
+
*risk: pilot --&gt; not cost covering
</li></ul>
+
 
</td></tr>
+
|-
<tr>
+
|
<td>
+
<u>'''Republic South Africa / SHS'''</u>  
<p><u><b>Republic South Africa / SHS</b></u>
+
 
</p><p><u><b>Pakistan / SHS</b></u>
+
<u>'''Pakistan / SHS'''</u>
</p>
+
 
</td><td>
+
|
</td><td>
+
|
<ul><li><b>Fee for service with pre-paid metering</b>
+
*'''Fee for service with pre-paid metering'''
</li></ul>
+
 
<ol><li>complete financial failure
+
#complete financial failure  
</li><li>conceptual design resulted in no ownership and caused vandalism, theft,...
+
#conceptual design resulted in no ownership and caused vandalism, theft,...
</li></ol>
+
 
</td></tr>
+
|-
<tr>
+
|
<td>
+
<u>'''Senegal / SHS'''</u>  
<p><u><b>Senegal / SHS</b></u>
+
 
</p><p><u><b>Burkina Faso / SHS</b></u>
+
<u>'''Burkina Faso / SHS'''</u>
</p>
+
 
</td><td>
+
|
<ul><li><b>Fee for service </b>successful
+
*'''Fee for service '''successful
</li></ul>
+
 
</td><td>
+
|
</td></tr>
+
|-
<tr>
+
| <u>'''Ghana / grid'''</u>  
<td> <u><b>Ghana / grid</b></u>
+
|
</td><td>
+
*'''Multi-level tariff'''
<ul><li><b>Multi-level tariff</b>
+
 
</li></ul>
+
#'''prepaid''' and '''post paid metered'''
<ol><li><b>prepaid</b> and <b>post paid metered</b>
+
#[[Tariffs#Lifeline_tariff_-_Ghana|'''lifeline tariff''']]
</li><li><a href="http://www.endev.info/wiki/index.php/Tariffs#Lifeline_tariff_-_Ghana"><b>lifeline tariff</b></a>
+
 
</li></ol>
+
|
</td><td>
+
|-
</td></tr>
+
| <u>'''China / grid - households'''</u>  
<tr>
+
|
<td> <u><b>China / grid - households</b></u>
+
*'''one tariff pre paid metered'''
</td><td>
+
 
<ul><li><b>one tariff pre paid metered</b>
+
|
</li></ul>
+
|-
</td><td>
+
| <u>'''Rwanda / grid'''</u>  
</td></tr>
+
|
<tr>
+
*'''one tariff pre paid metered'''<br>
<td> <u><b>Rwanda / grid</b></u>
+
 
</td><td>
+
|
<ul><li><b>one tariff pre paid metered</b><br />
+
*power production to low for overall demand
</li></ul>
+
 
</td><td>
+
#utility prefers to connect only big consumers
<ul><li>power production to low for overall demand
+
 
</li></ul>
+
*off grid tariff (MHP) lower than grid tariff
<ol><li>utility prefers to connect only big consumers
+
 
</li></ol>
+
#not cost covering
<ul><li>off grid tariff (MHP) lower than grid tariff
+
 
</li></ul>
+
|-
<ol><li>not cost covering
+
| <u>'''Zambia / grid'''</u>  
</li></ol>
+
|
</td></tr>
+
*recently change from '''flat rate''' to '''prepaid tariff'''
<tr>
+
 
<td> <u><b>Zambia / grid</b></u>
+
#resulted in lower electricity consumption
</td><td>
+
 
<ul><li>recently change from <b>flat rate</b> to <b>prepaid tariff</b>
+
|
</li></ul>
+
*with reduced electricity consumption the demand for charcoal increase singnificant
<ol><li>resulted in lower electricity consumption
+
 
</li></ol>
+
|-
</td><td>
+
| <u>'''Senegal / Minigrids'''</u>  
<ul><li>with reduced electricity consumption the demand for charcoal increase singnificant
+
|
</li></ul>
+
*'''flat rate''' with '''consumption limiter'''
</td></tr>
+
 
<tr>
+
|
<td> <u><b>Senegal / Minigrids</b></u>
+
*one tariff nationwide
</td><td>
+
 
<ul><li><b>flat rate</b> with <b>consumption limiter</b>
+
#not cost covering under all conditions
</li></ul>
+
 
</td><td>
+
|-
<ul><li>one tariff nationwide
+
| '''Marocco / planned for island grid'''
</li></ul>
+
|
<ol><li>not cost covering under all conditions
+
*'''load variable tariff'''
</li></ol>
+
 
</td></tr>
+
|
<tr>
+
|-
<td> <b>Marocco / planned for island grid</b>
+
|
</td><td>
+
|
<ul><li><b>load variable tariff</b>
+
|
</li></ul>
+
|}
</td><td>
+
 
</td></tr>
+
<br>
<tr>
+
 
<td>
+
[[Tariffs|Link to Tariff in the Hydro Portal]]
</td><td>
+
 
</td><td>
+
[[Metering and billing systems|Link to Metering and billing systems]]
</td></tr></table>
 
<p><br /> <a href="Tariffs">Link to Tariff in the Hydro Portal</a>
 
</p><p><a href="Metering and billing systems">Link to Metering and billing systems</a>
 
</p>
 
  
 
[[Category:Financing, promotion schemes and subsidies]]
 
[[Category:Financing, promotion schemes and subsidies]]

Revision as of 09:44, 5 August 2009

Results of the discussions during Mata 2009 about:

Which tariffs and billing systems have been successful? Which challenges have been identified?

Country/Project/System System applied successful Challenges
Indonesia / MHP /Micro Hydro Schemes
  • Communal-set tariffs
  1. Flat rate (households)
  2. Item based (eg # of bulbs)
  3. Cluster metering
  • Overloading
  • Sanction management
Pakistan
  • Item based (eg # of bulbs)
planned in Ethiopia / EnDev / Micro Hydro Schemes
  • flat rate (no productive use) + mech.load limiter; only CLF, no social tariff
  • Expected challenges:
  1. billing - recovery rate too low
  2. monitoring of applied devices
  3. Static system
  • risk: pilot --> not cost covering

Republic South Africa / SHS

Pakistan / SHS

  • Fee for service with pre-paid metering
  1. complete financial failure
  2. conceptual design resulted in no ownership and caused vandalism, theft,...

Senegal / SHS

Burkina Faso / SHS

  • Fee for service successful
Ghana / grid
  • Multi-level tariff
  1. prepaid and post paid metered
  2. lifeline tariff
China / grid - households
  • one tariff pre paid metered
Rwanda / grid
  • one tariff pre paid metered
  • power production to low for overall demand
  1. utility prefers to connect only big consumers
  • off grid tariff (MHP) lower than grid tariff
  1. not cost covering
Zambia / grid
  • recently change from flat rate to prepaid tariff
  1. resulted in lower electricity consumption
  • with reduced electricity consumption the demand for charcoal increase singnificant
Senegal / Minigrids
  • flat rate with consumption limiter
  • one tariff nationwide
  1. not cost covering under all conditions
Marocco / planned for island grid
  • load variable tariff


Link to Tariff in the Hydro Portal