Difference between revisions of "Tariffs and Billings Systems - Experience Matrix - MATA 2009"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 72: Line 72:
 
*'''Multi-level tariff'''
 
*'''Multi-level tariff'''
 
#'''prepaid''' and '''post paid metered'''
 
#'''prepaid''' and '''post paid metered'''
#[[Tariffs#Lifeline tariff - Ghana|lifeline tariff]]
+
#[[Tariffs#Example_Ghana:|lifeline tariff]]
  
 
|  
 
|  
Line 130: Line 130:
 
[[Tariffs|⇒ Link to Tariffs in the Hydro Portal]]
 
[[Tariffs|⇒ Link to Tariffs in the Hydro Portal]]
  
[[Metering and billing systems|⇒ Link to Metering and billing systems]]
+
[[Metering_and_Billing_Systems|⇒ Link to Metering and billing systems]]
  
 +
[[Category:Burkina_Faso]]
 +
[[Category:China]]
 +
[[Category:Ethiopia]]
 +
[[Category:Ghana]]
 +
[[Category:Indonesia]]
 +
[[Category:Morocco]]
 +
[[Category:Pakistan]]
 +
[[Category:Rwanda]]
 +
[[Category:Senegal]]
 +
[[Category:South_Africa]]
 +
[[Category:Zambia]]
 
[[Category:Financing_and_Funding]]
 
[[Category:Financing_and_Funding]]
[[Category:Zambia]]
 
[[Category:South_Africa]]
 
[[Category:Senegal]]
 
[[Category:Rwanda]]
 
[[Category:Pakistan]]
 
[[Category:Morocco]]
 
[[Category:Indonesia]]
 
[[Category:Ghana]]
 
[[Category:Ethiopia]]
 
[[Category:China]]
 
[[Category:Burkina_Faso]]
 

Revision as of 15:25, 8 July 2014

Maintenance: Revision needed
This article needs to be revised. Please rewrite the article according to the specifications below. Only remove this maintenance box after a thorough revision of this article. See the discussion page for more details or start a discussion there.

In particular the following aspects and passages have been specified to be in need for a revision:
Überarbeitungshinweis: Überführen in Übersichtstabelle im zukünftigen Finance-Portal.

Results - Mata 2009

Results of the discussions during Mata 2009 about:

  • Which tariffs and billing systems have been successful?
  • Which challenges have been identified?


Country/Project/System System applied successful Challenges
Indonesia / MHP /Micro Hydro Schemes
  • Communal-set tariffs
  1. Flat rate (households)
  2. Item based (eg # of bulbs)
  3. Cluster metering
  • Overloading
  • Sanction management
Pakistan
  • Item based (eg # of bulbs)
planned in Ethiopia / EnDev / Micro Hydro Schemes
  • flat rate (no productive use) + mech.load limiter; only CLF, no social tariff
  • Expected challenges:
  1. billing - recovery rate too low
  2. monitoring of applied devices
  3. Static system
  • risk: pilot --> not cost covering

Republic South Africa / SHS

Pakistan / SHS

  • Fee for service with pre-paid metering
  1. complete financial failure
  2. conceptual design resulted in no ownership and caused vandalism, theft,...

Senegal / SHS

Burkina Faso / SHS

  • Fee for service successful
Ghana / grid
  • Multi-level tariff
  1. prepaid and post paid metered
  2. lifeline tariff
China / grid - households
  • one tariff pre paid metered
Rwanda / grid
  • one tariff pre paid metered
  • power production to low for overall demand
  1. utility prefers to connect only big consumers
  • off grid tariff (MHP) lower than grid tariff
  1. not cost covering
Zambia / grid
  • recently change from flat rate to prepaid tariff
  1. resulted in lower electricity consumption
  • with reduced electricity consumption the demand for charcoal increase singnificant
Senegal / Minigrids
  • flat rate with consumption limiter
  • one tariff nationwide
  1. not cost covering under all conditions
Marocco / planned for island grid
  • load variable tariff