Difference between revisions of "Tariffs and Billings Systems - Experience Matrix - MATA 2009"

From energypedia
***** (***** | *****)
m (New page: Results of the discussions during Mata 2009 about: = Which tariffs and billing systems have been successful? Which challenges have been identified? = {| width="98%" cellspacing="1" cellp...)
 
***** (***** | *****)
m
Line 1: Line 1:
Results of the discussions during Mata 2009 about:
+
Results of the discussions during Mata 2009 about:  
  
= Which tariffs and billing systems have been successful? Which challenges have been identified? =
+
= Which tariffs and billing systems have been successful? Which challenges have been identified? =
  
 
{| width="98%" cellspacing="1" cellpadding="7" border="1"
 
{| width="98%" cellspacing="1" cellpadding="7" border="1"
 
|-
 
|-
| '''Country/Project/System'''
+
| '''Country/Project/System'''  
| '''system applied successful'''
+
| '''system applied successful'''  
 
| '''Challenge'''
 
| '''Challenge'''
 
|-
 
|-
| Indonesia / MHP /Micro Hydro Schemes
+
| Indonesia / MHP /Micro Hydro Schemes  
 
|  
 
|  
Communal-set tariffs
+
Communal-set tariffs  
  
#Flat rate (households)
+
#Flat rate (households)  
#Item based (eg #of bulbs)
+
#Item based (eg #of bulbs)  
 
#Cluster metering
 
#Cluster metering
  
Line 20: Line 20:
  
 
|  
 
|  
*Overloading
+
*Overloading  
 
*Sanction management
 
*Sanction management
  
 
|-
 
|-
| Pakistan
+
| Pakistan  
| Item based (eg #of bulbs)
+
| Item based (eg #of bulbs)  
 
|  
 
|  
 
|-
 
|-
 +
| planned in Ethiopia / EnDev / Micro Hydro Schemes
 
|  
 
|  
|
+
*flat rate (no productive use) + mech.load limiter; only CLF, no social tariff
 +
 
 
|  
 
|  
 
|-
 
|-

Revision as of 11:13, 10 July 2009

Results of the discussions during Mata 2009 about:

Which tariffs and billing systems have been successful? Which challenges have been identified?

Country/Project/System system applied successful Challenge
Indonesia / MHP /Micro Hydro Schemes

Communal-set tariffs

  1. Flat rate (households)
  2. Item based (eg #of bulbs)
  3. Cluster metering

2.

  • Overloading
  • Sanction management
Pakistan Item based (eg #of bulbs)
planned in Ethiopia / EnDev / Micro Hydro Schemes
  • flat rate (no productive use) + mech.load limiter; only CLF, no social tariff