| Indonesia / MHP /Micro Hydro Schemes  
+
| <u>'''Indonesia / MHP /Micro Hydro Schemes'''</u>
 
|  
 
|  
Communal-set tariffs  
+
*'''Communal-set tariffs'''
  
#Flat rate (households)  
+
#'''Flat rate''' (households)  
#Item based (eg #of bulbs)  
+
#'''Item based''' (eg # of bulbs)  
#Cluster metering
+
#'''Cluster metering'''
 
 
2.
 
  
 
|  
 
|  
Line 24: Line 22:
  
 
|-
 
|-
| Pakistan  
+
| <u>'''Pakistan'''</u>
| Item based (eg #of bulbs)  
+
|  
 +
*'''Item based '''(eg # of bulbs)
 +
 
 
|  
 
|  
 
|-
 
|-
| planned in Ethiopia / EnDev / Micro Hydro Schemes  
+
| planned in <u>'''Ethiopia / EnDev / Micro Hydro Schemes'''</u>
 
|  
 
|  
*flat rate (no productive use) + mech.load limiter; only CLF, no social tariff
+
*'''flat rate''' (no productive use) + mech.'''load limiter'''; only CLF, no social tariff
  
 
|  
 
|  
 +
*Expected challenges:
 +
 +
#billing - recovery rate too low
 +
#monitoring of applied devices
 +
#Static system
 +
 +
*risk: pilot --&gt; not cost covering
 +
 
|-
 
|-
 
|  
 
|  
 +
<u>'''Republic South Africa / SHS'''</u>
 +
 +
<u>'''Pakistan / SHS'''</u>
 +
 
|  
 
|  
 
|  
 
|  
 +
*'''Fee for service with pre-paid metering'''
 +
 +
#complete financial failure
 +
#conceptual design resulted in no ownership and caused vandalism, theft,...
 +
 
|-
 
|-
 +
| <u>'''Ghana / grid'''</u>
 
|  
 
|  
|
+
*'''Multi-level tariff'''
 +
 
 +
#'''prepaid''' and '''post paid metered'''
 +
#'''lifetime tariff'''
 +
 
 
|  
 
|  
 
|-
 
|-

Revision as of 08:40, 13 July 2009

Results of the discussions during Mata 2009 about:

Which tariffs and billing systems have been successful? Which challenges have been identified?

Country/Project/System System applied successful Challenges
Indonesia / MHP /Micro Hydro Schemes
  • Communal-set tariffs
  1. Flat rate (households)
  2. Item based (eg # of bulbs)
  3. Cluster metering
  • Overloading
  • Sanction management
Pakistan
  • Item based (eg # of bulbs)
planned in Ethiopia / EnDev / Micro Hydro Schemes
  • flat rate (no productive use) + mech.load limiter; only CLF, no social tariff
  • Expected challenges:
  1. billing - recovery rate too low
  2. monitoring of applied devices
  3. Static system
  • risk: pilot --> not cost covering

Republic South Africa / SHS

Pakistan / SHS

  • Fee for service with pre-paid metering
  1. complete financial failure
  2. conceptual design resulted in no ownership and caused vandalism, theft,...
Ghana / grid
  • Multi-level tariff
  1. prepaid and post paid metered
  2. lifetime tariff