Difference between revisions of "Tariffs and Billings Systems - Experience Matrix - MATA 2009"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 55: Line 55:
  
 
|-
 
|-
| <u>'''Ghana / grid'''</u>
 
 
|  
 
|  
*'''Multi-level tariff'''
+
<u>'''Senegal / SHS'''</u>
  
#'''prepaid''' and '''post paid metered'''
+
<u>'''Burkina Faso / SHS'''</u>
#'''lifeline tariff'''
 
  
 
|  
 
|  
|-
+
*'''Fee for service '''successful
|
+
 
|
 
 
|  
 
|  
 
|-
 
|-
 +
| <u>'''Ghana / grid'''</u>
 
|  
 
|  
|
+
*'''Multi-level tariff'''
 +
 
 +
#'''prepaid''' and '''post paid metered'''
 +
#[http://www.endev.info/wiki/index.php/Tariffs#Lifeline_tariff_-_Ghana '''lifeline tariff''']
 +
 
 
|  
 
|  
 
|-
 
|-
 +
| <u>'''China / grid - households'''</u>
 
|  
 
|  
|
+
*'''one tariff pre paid metered'''
 +
 
 
|  
 
|  
 
|-
 
|-
 +
| <u>'''Rwanda / grid'''</u>
 
|  
 
|  
 +
*'''one tariff pre paid metered'''<br>
 +
 
|  
 
|  
|
+
*power production to low for overall demand
 +
 
 +
#utility prefers to connect only big consumers
 +
 
 +
*off grid tariff (MHP) lower than grid tariff
 +
 
 +
#not cost covering
 +
 
 
|-
 
|-
 +
| <u>'''Zambia / grid'''</u>
 
|  
 
|  
 +
*recently change from '''flat rate''' to '''prepaid tariff'''
 +
 +
#resulted in lower electricity consumption
 +
 
|  
 
|  
|
+
*with reduced electricity consumption the demand for charcoal increase singnificant
 +
 
 
|-
 
|-
 +
| <u>'''Senegal / Minigrids'''</u>
 
|  
 
|  
 +
*'''flat rate''' with '''consumption limiter'''
 +
 
|  
 
|  
|
+
*one tariff nationwide
 +
 
 +
#not cost covering under all conditions
 +
 
 
|-
 
|-
 +
| '''Marocco / planned for island grid'''
 
|  
 
|  
|
+
*'''load variable tariff'''
|
+
 
|-
 
|
 
|
 
|
 
|-
 
|
 
|
 
|
 
|-
 
|
 
|
 
|
 
|-
 
|
 
|
 
|
 
|-
 
|
 
|
 
|
 
|-
 
|
 
|
 
 
|  
 
|  
 
|-
 
|-

Revision as of 09:05, 13 July 2009

Results of the discussions during Mata 2009 about:

Which tariffs and billing systems have been successful? Which challenges have been identified?

Country/Project/System System applied successful Challenges
Indonesia / MHP /Micro Hydro Schemes
  • Communal-set tariffs
  1. Flat rate (households)
  2. Item based (eg # of bulbs)
  3. Cluster metering
  • Overloading
  • Sanction management
Pakistan
  • Item based (eg # of bulbs)
planned in Ethiopia / EnDev / Micro Hydro Schemes
  • flat rate (no productive use) + mech.load limiter; only CLF, no social tariff
  • Expected challenges:
  1. billing - recovery rate too low
  2. monitoring of applied devices
  3. Static system
  • risk: pilot --> not cost covering

Republic South Africa / SHS

Pakistan / SHS

  • Fee for service with pre-paid metering
  1. complete financial failure
  2. conceptual design resulted in no ownership and caused vandalism, theft,...

Senegal / SHS

Burkina Faso / SHS

  • Fee for service successful
Ghana / grid
  • Multi-level tariff
  1. prepaid and post paid metered
  2. lifeline tariff
China / grid - households
  • one tariff pre paid metered
Rwanda / grid
  • one tariff pre paid metered
  • power production to low for overall demand
  1. utility prefers to connect only big consumers
  • off grid tariff (MHP) lower than grid tariff
  1. not cost covering
Zambia / grid
  • recently change from flat rate to prepaid tariff
  1. resulted in lower electricity consumption
  • with reduced electricity consumption the demand for charcoal increase singnificant
Senegal / Minigrids
  • flat rate with consumption limiter
  • one tariff nationwide
  1. not cost covering under all conditions
Marocco / planned for island grid
  • load variable tariff