Results of the discussions during Mata 2009 about:
 
Results of the discussions during Mata 2009 about:
 
+
*Which tariffs and billing systems have been successful?
*Which tariffs and billing systems have been successful?  
 
 
*Which challenges have been identified?
 
*Which challenges have been identified?
  
 +
<br/>
  
 
+
{| cellpadding="7" cellspacing="1" border="1" style="width: 98%;"
{| cellpadding="7" cellspacing="1" border="1" width="98%"
 
 
|-
 
|-
| width="30%" | '''Country/Project/System'''
+
| style="width: 30%;" | '''Country/Project/System'''
| width="34%" | '''System applied successful'''
+
| style="width: 34%;" | '''System applied successful'''
 
| '''Challenges'''
 
| '''Challenges'''
 
|-
 
|-
Line 19: Line 19:
 
|  
 
|  
 
*'''Communal-set tariffs'''
 
*'''Communal-set tariffs'''
 
 
#'''Flat rate''' (households)
 
#'''Flat rate''' (households)
 
#'''Item based''' (eg # of bulbs)
 
#'''Item based''' (eg # of bulbs)
Line 41: Line 40:
 
|  
 
|  
 
*Expected challenges:
 
*Expected challenges:
 
 
#billing - recovery rate too low
 
#billing - recovery rate too low
 
#monitoring of applied devices
 
#monitoring of applied devices
 
#Static system
 
#Static system
 
 
*risk: pilot --> not cost covering
 
*risk: pilot --> not cost covering
  
Line 57: Line 54:
 
|  
 
|  
 
*'''Fee for service with pre-paid metering'''
 
*'''Fee for service with pre-paid metering'''
 
 
#complete financial failure
 
#complete financial failure
 
#conceptual design resulted in no ownership and caused vandalism, theft,...
 
#conceptual design resulted in no ownership and caused vandalism, theft,...
Line 75: Line 71:
 
|  
 
|  
 
*'''Multi-level tariff'''
 
*'''Multi-level tariff'''
 
 
#'''prepaid''' and '''post paid metered'''
 
#'''prepaid''' and '''post paid metered'''
#[[Tariffs#Lifeline_tariff_-_Ghana|'''lifeline tariff''']]
+
#[[Tariffs#Lifeline tariff - Ghana|lifeline tariff]]
  
 
|  
 
|  
Line 93: Line 88:
 
|  
 
|  
 
*power production to low for overall demand
 
*power production to low for overall demand
 
 
#utility prefers to connect only big consumers
 
#utility prefers to connect only big consumers
 
 
*off grid tariff (MHP) lower than grid tariff
 
*off grid tariff (MHP) lower than grid tariff
 
 
#not cost covering
 
#not cost covering
  
Line 104: Line 96:
 
|  
 
|  
 
*recently change from '''flat rate''' to '''prepaid tariff'''
 
*recently change from '''flat rate''' to '''prepaid tariff'''
 
 
#resulted in lower electricity consumption
 
#resulted in lower electricity consumption
  
Line 117: Line 108:
 
|  
 
|  
 
*one tariff nationwide
 
*one tariff nationwide
 
 
#not cost covering under all conditions
 
#not cost covering under all conditions
  
Line 128: Line 118:
 
|}
 
|}
  
 
+
<br/>
  
 
= References<br/> =
 
= References<br/> =
Line 134: Line 124:
 
<references />
 
<references />
  
 +
<br/>
  
 
+
<br/>
 
 
  
 
[[Tariffs|⇒ Link to Tariffs in the Hydro Portal]]
 
[[Tariffs|⇒ Link to Tariffs in the Hydro Portal]]
Line 142: Line 132:
 
[[Metering and billing systems|⇒ Link to Metering and billing systems]]
 
[[Metering and billing systems|⇒ Link to Metering and billing systems]]
  
 +
[[Category:Financing_and_Funding]]
 +
[[Category:Zambia]]
 +
[[Category:South_Africa]]
 +
[[Category:Senegal]]
 +
[[Category:Rwanda]]
 +
[[Category:Pakistan]]
 +
[[Category:Morocco]]
 +
[[Category:Indonesia]]
 +
[[Category:Ghana]]
 +
[[Category:Ethiopia]]
 +
[[Category:China]]
 
[[Category:Burkina_Faso]]
 
[[Category:Burkina_Faso]]
[[Category:China]]
 
[[Category:Ethiopia]]
 
[[Category:Ghana]]
 
[[Category:Indonesia]]
 
[[Category:Morocco]]
 
[[Category:Pakistan]]
 
[[Category:Rwanda]]
 
[[Category:Senegal]]
 
[[Category:South_Africa]]
 
[[Category:Zambia]]
 
[[Category:Financing,_promotion_schemes_and_subsidies]]
 

Revision as of 07:49, 25 April 2013

Maintenance: Revision needed
This article needs to be revised. Please rewrite the article according to the specifications below. Only remove this maintenance box after a thorough revision of this article. See the discussion page for more details or start a discussion there.

In particular the following aspects and passages have been specified to be in need for a revision:
Überarbeitungshinweis: Überführen in Übersichtstabelle im zukünftigen Finance-Portal.

Results - Mata 2009

Results of the discussions during Mata 2009 about:

  • Which tariffs and billing systems have been successful?
  • Which challenges have been identified?


Country/Project/System System applied successful Challenges
Indonesia / MHP /Micro Hydro Schemes
  • Communal-set tariffs
  1. Flat rate (households)
  2. Item based (eg # of bulbs)
  3. Cluster metering
  • Overloading
  • Sanction management
Pakistan
  • Item based (eg # of bulbs)
planned in Ethiopia / EnDev / Micro Hydro Schemes
  • flat rate (no productive use) + mech.load limiter; only CLF, no social tariff
  • Expected challenges:
  1. billing - recovery rate too low
  2. monitoring of applied devices
  3. Static system
  • risk: pilot --> not cost covering

Republic South Africa / SHS

Pakistan / SHS

  • Fee for service with pre-paid metering
  1. complete financial failure
  2. conceptual design resulted in no ownership and caused vandalism, theft,...

Senegal / SHS

Burkina Faso / SHS

  • Fee for service successful
Ghana / grid
  • Multi-level tariff
  1. prepaid and post paid metered
  2. lifeline tariff
China / grid - households
  • one tariff pre paid metered
Rwanda / grid
  • one tariff pre paid metered
  • power production to low for overall demand
  1. utility prefers to connect only big consumers
  • off grid tariff (MHP) lower than grid tariff
  1. not cost covering
Zambia / grid
  • recently change from flat rate to prepaid tariff
  1. resulted in lower electricity consumption
  • with reduced electricity consumption the demand for charcoal increase singnificant
Senegal / Minigrids
  • flat rate with consumption limiter
  • one tariff nationwide
  1. not cost covering under all conditions
Marocco / planned for island grid
  • load variable tariff


References




⇒ Link to Tariffs in the Hydro Portal

⇒ Link to Metering and billing systems