Difference between revisions of "Tekeze"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 7: Line 7:
 
|HPDBOperator=Ethiopian national grid at Mekele
 
|HPDBOperator=Ethiopian national grid at Mekele
 
|HPDBProject Status=Completed
 
|HPDBProject Status=Completed
|HPDBPower=300000
+
|HPDBPower=300.000
|HPDBEnergy=981000000
+
|HPDBEnergy=981.000.000
 
|HPDBCapacity Factor=37
 
|HPDBCapacity Factor=37
 
|HPDBPenstock Flow=119
 
|HPDBPenstock Flow=119

Revision as of 12:49, 13 July 2012


Back to the Hydropower Sites Database

General Information

Country: Ethiopia
City/Town: Amhara
Coordinates (Powerhouse): The following coordinate was not recognized: Latitude= 13.3492, Longitude= 38.74049.The following coordinate was not recognized: Latitude= 13.3492, Longitude= 38.74049.
Year of Commission: 2009
Basin Name: Tekeze River (a tributary of Atbarah River which is a tributary of the Nile)
Stream Name:
Developer:
Operator: Ethiopian national grid at Mekele
Project Status: Completed
Any other uses of the water source:
Contact:
Comment:
Link to Photos:

Technical Information

Power: (kW) 300.000
Energy (kWh/a): 981.000.000
Capacity Factor (%): 37
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s): 119
Minimum Flow of the Stream (m³/s):
Head (m): 155
Turbine Type: Fracis turbines
Turbine Manufacturer: Dongfang China
Generator Type:
Generator Capacity (kW):
Generator Manufacturer: Dongfang China
Comment:

Mini/Island Grid Information

Mini Grid: No
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m): 105000
Voltage (v): 230000
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment:

Dam Information

Dam Type:

Dam on river with reservoir
Dam Construction Material: Concrete Arch Dam
Dam Height [m]: 188
Length of Dam [m]: 420
Storage Volume of Reservoir (m³): 9310000000
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€): 364,999,999
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment: Project Financed By: China Exim Bank ($50 million)
Link to Cost Breakdown: