Model ToR EE-Lighting

From energypedia


This part compiles Terms of Reference (ToR) that can be applied in the implementation of measures and/or projects to energy efficient lighting. ToR are available to the following aspects:

  • to conduct studies to know about actual (framework) conditions in a country
  • to plan, implement and monitor information- and sensitization campaigns
  • to design information material
  • to plan and implement capacity building measures
  • to implement actual lighting measures (audits)


Category
Key Words
Description
Download

Studies

ELS

Market development

Light planning

Capacity development

Kosovo 




The ToR describe work tasks to conduct a study of the current market situation of ELS (Energy Efficient Lighting Systems) in Kosovo, including the aspects of service provision, market potentials, marketing, plus the available capacities for light planning in Kosovo.

ToR_ELS_market_20100201.doc

Electricity market conditions

Baseline

Legal framework

Political framework

Kosovo


The ToR describes the work tasks to conduct a brief baseline analysis of the supply and demand side of electricity provision, and the legal and political framework conditions in Kosovo.

ToR_Baseline_Electricity_Framework.doc

Good practices

EE light households

Market development

Policy advisory services





The ToR describe work tasks to compile possible approaches to support the implementation of energy efficient lighting in households. The compilation is meant as basis for discussion with/for political decision-makers.

ToR Study EELighting HH.doc

Information- & Sensitization Campaigns

Energy efficient lighting

Programme

Sensitization

Campaign

Kosovo


The ToR describe work tasks for the development of a campaign programme and promotion concept for an energy efficient lighting campaign in households. Work tasks also comprise professional supervision in the implementation of the campaign and the concept.

ToR EElighting Progr Campaign.doc


 


Lighting checks

Bulb exchange

Supervision of students

The ToR describes supervision and coordination tasks in implementing lighting checks and exchanging conventional bulbs for CFLS in households.

ToR supervision light checks.doc

Consumer survey

Baseline

socio-economic

The ToR describe work tasks to conduct a consumer survey as part of a lighting campaign. The consumer survey is meant as a baseline document and addresses consumers’ attitude and degree of knowledge to CFLs.

ToR ConsumerSurvey Baseline.doc

Consumer survey

Baseline & evaluation

socio-economic

The ToR describe work tasks to conduct a consumer survey as part of a lighting campaign. It details the tasks in the framework of conducting a baseline survey as well as an evaluation interview. The survey addresses consumers’ attitude and degree of knowledge to CFLs.

ToR ConsumerSurvey Baseline Eval.doc

Translation qualitative interviews

Household interviews

Qualitative interviews

Barriers

Motivators

In the framework of a lighting campaign in Kosovo, qualitative interviews were conducted to learn about potential barriers and motivators for energy efficient lighting. The ToRs specify the work tasks for a translator in conducting and supporting the qualitative interviews. ToR Translator Interviews.doc

Monitoring system

Results

Indicator

Baseline

Methods


The ToR describe the work tasks to develop a concept for a monitoring system in the framework of a lighting campaign in Kosovo. The ToR cover the baseline requirements, the transferability of the concept and information needs.

ToR Monitoring System Lighting Campaign.doc

Information Material

Brochures

ELS

Financing models

Public buildings

Street light

Version A of the ToR describe the work tasks in the development of brochures to: 1 Energy efficient lighting public buildings, 2 Street light, 3 'Quality, key to economic efficiency of energy efficient lighting systems’, 4 Innovative financing models: Contracting.
Version B only refers to 1 and 3.
ToR Info Brochures.doc

Capacity Building

ToR

Public buildings

Street light

Decision-makers, capacity building

The ToR describe the work tasks to prepare and implement information seminars to energy efficient lighting for decision-makers in the public sphere. The tasks also imply capacity building measures for EE-experts to implement similar seminars.

ToR InfoSeminars DecisionMaker.docx

Training, auditors, light planners, electrical engineers


The ToR describe the work tasks to prepare and implement training measures to energy efficient lighting. They contain the development of curricula, briefly describe some possible contents and detail requirements for the seminar. ToR_Training_Technicians.doc

Implementation of actual Lighting Measures

Lighting audit, walk-through audit, public buildings, Kosovo


The ToR describe related work tasks to implement lighting audits and walk-through-audits, each in three public buildings in Kosovo. An overview about the buildings is provided as well as a brief outline to the contents of a lighting audit and a walk-through-audit. ToR_Lighting_Audits.doc