Difference between revisions of "SPIS Toolbox - Set Up - Further Readings"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
 
(16 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 +
{{SPIS Set Up}}{{Back to SPIS Toolbox}}
  
{{SPIS Banner}}
+
=== '''<span style="color: rgb(135, 150, 55);">Further Readings</span>''' ===
  
=== '''<span style="color:#879637;">Further Reading, Links and Tools</span>''' ===
+
*Centre for Land and Water: Knowledge Resources for Primary Industry. Retrieved from [http://www.claw.net.nz/resources/irrigation/ http://www.claw.net.nz/resources/irrigation/]
 
+
*Hahn, A., Sass, J. & Fröhlich, C. (2015): Manual and tools for promoting SPIS. Multicountry - Stocktaking and Analysis Report. GFA Consulting Group. Retrieved from [[Solar_Powered_Irrigation_Systems_-_Technology,_Economy,_Impacts|Solar Powered Irrigation Systems - Technology, Economy, Impacts]]<br/>
===== '''Links''' =====
+
*Schultz, R. & Suryani, A. (2015): EnDev2 Indonesia: Inspection Guide for Photovoltaic Village Power (PVVP) Systems. Edited by GIZ. Retrieved from [https://energypedia.info/images/3/39/Inspection_Guide_for_PVVP_150524_(GIZ_2015).pdf https://energypedia.info/images/3/39/Inspection_Guide_for_PVVP_150524_(GIZ_2015).pdf]
 
+
{{SPIS Reference}}
*“IRRIG8QUICK Irrigation Calibration Quick Test - Guidelines for Drip Micro Irrigation” by Page Blomer Associates (2009) at: [http://www.claw.net.nz/resources/irrigation/ www.claw.net.nz/resources/irrigation] (08/13/2015)
 
 
 
*“Solar-Powered Irrigation Systems – Stocktaking and Analysis Report” by German Technical Cooperation Agency (GIZ) (2015)
 
*Schultz and Suryani, 2015. EnDev2 Indonesia: Inspection Guide for Photovoltaic Village Power (PVVP) Systems. GIZ
 
 
 
&nbsp;
 
 
 
===== '''SPIS tools''' =====
 
 
 
*'''SET UP 01''' – PV Acceptance Test: Guideline to compare the installed with the actual capacity of the pump
 
*'''SET UP 02''' – Workmanship Quality Checklist: Checklist for inspecting and verifying the workmanship quality
 
 
 
&nbsp;
 
 
 
The following tools that are assigned to other Modules are also relevant:
 
 
 
*'''PROMOTE 01'''- SPIS Rapid Assessment: on the analysis of the market for service provision
 
*'''DESIGN 03'''- Pump Sizing Tool: to verify SPIS acceptance testing
 
*'''MAINTAIN 03-''' Water application uniformity test: that should be implemented directly after setting up the system&nbsp;
 
*{{SPIS Reference}}
 

Latest revision as of 13:48, 5 November 2017

Further Readings