Knowledge fuels change - Support energypedia!
For over 10 years, energypedia has been connecting energy experts around the world — helping them share knowledge, learn from each other, and accelerate the global energy transition.
Today, we ask for your support to keep this platform free and accessible to all. Even a small contribution makes a big difference! If just 10–20% of our 60,000+ monthly visitors donated the equivalent of a cup of coffee — €5 — Energypedia would be fully funded for a whole year.
Is the knowledge you’ve gained through Energypedia this year worth €5 or more?
Your donation keeps the platform running, helps us create new knowledge products, and contributes directly to achieving SDG 7.


Donate now and support open access to energy expertise

Thank you for your support, your donation, big or small, truly matters!

Difference between revisions of "Portal:Hydro"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 11: Line 11:
 
*[[Civil engineering - hydro power|Civil Engineering]]
 
*[[Civil engineering - hydro power|Civil Engineering]]
 
*[[Electrical-Mechanical Equipment|Electrical-Mechanical Equipment (Turbine, Generator, Controller)]]
 
*[[Electrical-Mechanical Equipment|Electrical-Mechanical Equipment (Turbine, Generator, Controller)]]
*[[Transfer_of_Technology_-_Hydro_Power|Importing - Licensing - Technology transfer]]
+
*[[Transfer of Technology - Hydro Power|Importing - Licensing - Technology transfer]]
 
*[[Local production/planning capacity|Local Production / Planning Capacity]]
 
*[[Local production/planning capacity|Local Production / Planning Capacity]]
 
*[[Upgrading of water mills, rehabilitation of existing power plants|Upgrading of Water Mills / Rehabilitation of Power Plants]]
 
*[[Upgrading of water mills, rehabilitation of existing power plants|Upgrading of Water Mills / Rehabilitation of Power Plants]]
Line 26: Line 26:
 
*[[Overall institutional set-up at national level|Overall institutional set-up at national level (incl. rural electrification agencies)]]
 
*[[Overall institutional set-up at national level|Overall institutional set-up at national level (incl. rural electrification agencies)]]
 
*[[Typical regulations for the installation and operation of small hydro power plants|Regulations for installation & operation of small hydro power plants (country specific)]]
 
*[[Typical regulations for the installation and operation of small hydro power plants|Regulations for installation & operation of small hydro power plants (country specific)]]
*[[Energy planning for rural areas|Energy planning for rural areas (national level, local level)]] • [[Feed-in policies|Feed-in policies]] • [[Promotional instruments|Promotional instruments]]
+
*[[Energy planning for rural areas|Energy planning for rural areas (national level, local level)]] • [[Feed-in_Policies|Feed-in policies]] • [[Promotional instruments|Promotional instruments]]
  
  
Line 46: Line 46:
 
*[[Hydropower: Grants & subsidies|Grants, Subsidies]]
 
*[[Hydropower: Grants & subsidies|Grants, Subsidies]]
 
*[[Loans|Loans (Soft Loans, Commercial Loans)]]
 
*[[Loans|Loans (Soft Loans, Commercial Loans)]]
*[[Venture capital|Venture Capital]]
+
*[[Venture_Capital|Venture Capital]]
 
*[[Project Financing (Ratna Sansar Shrestha, FCA)|Project Financing]]
 
*[[Project Financing (Ratna Sansar Shrestha, FCA)|Project Financing]]
 
*[[Involvement of MFIs]]
 
*[[Involvement of MFIs]]
Line 81: Line 81:
  
  
=== FAQs <br/> ===
+
=== FAQs<br/> ===
  
 
*[[HydroFaQ|... on Hydro]]
 
*[[HydroFaQ|... on Hydro]]

Revision as of 12:03, 9 May 2012

{{#icon:icon-hydro.png|||}}

Welcome to the Hydro Portal

Technological Aspects

.

Policy Framework


Operation and Business Models


Financing Models and Costs


Social and Environmental Impacts


Climate Change-related Issues


FAQs


Hydro Power Sites

<googlemap width="100%" type="terrain" icons="http://maps.google.com/mapfiles/marker{label}.png" version="0.9" lat="0.3" lon="28.125" zoom="3">

-0.9794, 29.6194, MHP Bwindi 0°58'46"S 29°37'10"E 1.216944, 34.738889, MHP Suam 1°13'1"N 34°44'20"E 3.581111, 31.772917, MHP Fofo 3°34'52.5"N 31°46'22.5"E 3.663611, 31.800833, PHP Gwere 3°39'49"N 31°48'3"E 2.36333333333, 31.1090277778, PHP Ayungu 2°21'48"N 31° 6'32.5"E

-3.670278, 37.410278, LHP Nyumba ya Mungu 3°40′13″S, 37°24′37″E -7.136667, 35.987778, LHP Mtera 07°08′12″S, 35°59′16″E -7.650222, 36.906822, LHP Kidatu 7°39'0.8S 36°54'24.56E -8.465353, 35.668314, LHP Kihansi 8°27'55.27S 35°40'05.93E -5.283333, 38.6, LHP Hale 5°17'0S 38°36'0E

-2.509005, 28.87528, LHP Rusizi I 2°30'32.42"S 28°52'31.01"E

-0.795386, 37.749642, LHP Gitaru 0°47'43.39S, 37° 44'58.71E -0.807761, 37.686406, LHP Kamburu Dam 0°48'27.94S, 37° 41'11.06E -0.806322, 37.811033, LHP Kindaruma 0°48'22.76S, 37° 48'39.72E -0.87845, 37.589056, LHP Masinga Dam 0°52'42.42S, 37°35'20.6E -0.639842, 37.90955, LHP Kiambere 0°38'23.43S, 37°54'34.38E

6.577778, 38.697306, MHP Gobecho I 6º34’40’’N 38º41’50.3’’ E 6.577778, 38.697222, MHP Gobecho II 6º34’39.7’’N 38º41’50’’E 6.557444, 38.669, MHP Ererte 6º33’26.8’’N 38º40’8.4’’ E 6.624056, 38.518139, MHP Hagara 6º37’26.6’’N 38º31’5.3’’ E 6.683333, 38.700133, SHP Yaye (planned) 6º41’00’’N 38º42’48’’ E 13.344361, 38.745347, LHP Tekeze 13° 20′ 39.7″ N, 38° 44′ 43.25″ E 11.819444, 36.918889, LHP Beles 11° 49′ 10″ N, 36° 55′ 8″ E 7.831389, 37.321667, LHP Gilgel Gibe I 7° 49′ 53″ N, 37° 19′ 18″ E 7.756944, 37.562222, LHP Gilgel Gibe II 7° 45′ 25″ N, 37° 33′ 44″ E 8.393503, 39.3524641, LHP Awash II and III 8°23'36.61N 39°21'8.87E 11.4858626, 37.589711, LHP Tis Abay I 11°29'9.10N 37°35'22.95E 11.4887487, 37.5997773, LHP Tis Abay II 11°29'19.49N 37°35'59.19E 7.1200094, 39.3367356, LHP Melka Wakena 7°7'12.03N 39°20'12.24E 8.4691304, 39.1588636, LHP Koka 8°28'8.86N 39°9'31.9E

-1.915979, 29.401474,MHP Murunda 1°54'57.52S 29°24'5.30E (not exact location) -2.4052, 29.2646, MHP Masimeru 2°24'18.4S 29°15'52.7E -1.662044, 29.651413, MHP Musarara 1°39'43.35S 29°39'5.08E -1.768935, 30.131464, MHP Kavumu 1°46'8.16S 30°7'53.27E

-18.577764, 47.861764, MHP Mangamila to Tsaratsaotra 18° 34‘ 39.95‘‘S 47° 51’42.35‘‘E


(_grey) -22.558904, 17.082481, This is an example of a marker for a planned MHP site (it is not really in planning)!

</googlemap>


Projects + Workshops


Discussions


Library


Latest Hydro Articles

29 July 2025
Publication - Renewable Power Generation Costs in 2024
3 March 2025
Publication - Scaling Up Renewables in Europe and Central Asia: Barriers and Opportunities
28 January 2025
Publication - Planning and prospects for renewable power: Central Africa


Hydro News

Special:Wikilog/2/Template:WikilogTempl2/Category:Hydro


Hydro Events


Articles Needing Attention

Missing Articles