Knowledge fuels change
For over a decade, Energypedia has shared free, reliable energy expertise with the world.
We’re now facing a serious funding gap.
Help keep this platform alive — your donation, big or small, truly matters!
Thank you for your support
Difference between revisions of "Fierza"
From energypedia
***** (***** | *****) (Created page with "{{HPDB |HPDBCountry=Albania |HPDBCity/Town=Bajram Curri, Shkoder, |HPDBCoordinates=Latitude= 42.25139, Longitude= 20.04306 |HPDBDate of Commission=1978 |HPDBStream Name=Drin Riv...") |
***** (***** | *****) |
||
| Line 3: | Line 3: | ||
|HPDBCity/Town=Bajram Curri, Shkoder, | |HPDBCity/Town=Bajram Curri, Shkoder, | ||
|HPDBCoordinates=Latitude= 42.25139, Longitude= 20.04306 | |HPDBCoordinates=Latitude= 42.25139, Longitude= 20.04306 | ||
| − | |HPDBDate of Commission=1978 | + | |HPDBDate of Commission=1978 |
|HPDBStream Name=Drin River | |HPDBStream Name=Drin River | ||
|HPDBOperator=Korporata Elektroenergjitike Shqiptare (KESH). | |HPDBOperator=Korporata Elektroenergjitike Shqiptare (KESH). | ||
| + | |HPDBProject Status=Completed | ||
|HPDBPower=500000 | |HPDBPower=500000 | ||
|HPDBTurbine Type=Fracis turbines | |HPDBTurbine Type=Fracis turbines | ||
| Line 13: | Line 14: | ||
|HPDBCommentGI=Connected to national grid via 220kV lines | |HPDBCommentGI=Connected to national grid via 220kV lines | ||
|HPDBDam Type=Dam on river with reservoir | |HPDBDam Type=Dam on river with reservoir | ||
| − | |HPDBDam Construction Material=Rock-fill Dam | + | |HPDBDam Construction Material=Rock-fill Dam |
|HPDBDam Height=170 | |HPDBDam Height=170 | ||
}} | }} | ||
Revision as of 11:50, 31 July 2012
Back to the Hydropower Sites Database
General Information
| Country: | Albania |
|---|---|
| City/Town: | Bajram Curri, Shkoder, |
| Coordinates (Powerhouse): | The following coordinate was not recognized: Latitude= 42.25139, Longitude= 20.04306.The following coordinate was not recognized: Latitude= 42.25139, Longitude= 20.04306. |
| Year of Commission: | 1978 |
| Basin Name: | |
| Stream Name: | Drin River |
| Developer: | |
| Operator: | Korporata Elektroenergjitike Shqiptare (KESH). |
| Project Status: | Completed |
| Any other uses of the water source: | |
| Contact: | |
| Comment: | |
| Link to Photos: |
Technical Information
| Power: (kW) | 500000 |
|---|---|
| Energy (kWh/a): | |
| Capacity Factor (%): | |
| Penstock Diameter (mm): | |
| Penstock Length (m): | |
| Penstock Material (m³/s): | |
| Maximum Flow of the Penstock (m³/s): | |
| Minimum Flow of the Stream (m³/s): | |
| Head (m): | |
| Turbine Type: | Fracis turbines |
| Turbine Manufacturer: | Sulzer |
| Generator Type: | |
| Generator Capacity (kW): | |
| Generator Manufacturer: | Dongfang |
| Comment: |
Mini/Island Grid Information
| Mini Grid: | No |
|---|---|
| Load Control Information: | |
| Connection Type: | |
| Public Lighting: | |
| Length of Transmission Line (m): | |
| Voltage (v): | |
| Transmission Conductor (type) : | |
| Diameter of Conductor (mm²): | |
| Transformer Rating (kVA): | |
| Link to Grid: | |
| S.W.E.R: | |
| Operational Period (Xdays/year): | |
| Comment: | Connected to national grid via 220kV lines |
Dam Information
|
Dam Type: |
Dam on river with reservoir |
|---|---|
| Dam Construction Material: | Rock-fill Dam |
| Dam Height [m]: | 170 |
| Length of Dam [m]: | |
| Storage Volume of Reservoir (m³): | |
| Flood Storage of Reservoir: | |
| Channel Material: | |
| Comment: |
Economic Information
| Cost (€): | |
|---|---|
| Donor/Financier & Percentage: | |
| Tariff Levels: | |
| Connected Households: | |
| Connection Cost (€): | |
| Cost to be Covered by Households (%): | |
| Comment: | |
| Link to Cost Breakdown: |



















