Fierza

From energypedia


Back to the Hydropower Sites Database

General Information

Country: Albania
City/Town: Bajram Curri, Shkoder,
Coordinates (Powerhouse): 42° 15' 5.00" N, 20° 2' 35.02" E
Year of Commission: 1978
Basin Name:
Stream Name: Drin River
Developer:
Operator: Korporata Elektroenergjitike Shqiptare (KESH).
Project Status: Completed
Any other uses of the water source:
Contact:
Comment:
Link to Photos:

Technical Information

Power: (kW) 500000
Energy (kWh/a):
Capacity Factor (%):
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type: Fracis turbines
Turbine Manufacturer: Sulzer
Generator Type:
Generator Capacity (kW):
Generator Manufacturer: Dongfang
Comment:

Mini/Island Grid Information

Mini Grid: No
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment: Connected to national grid via 220kV lines

Dam Information

Dam Type:

Dam on river with reservoir
Dam Construction Material: Rock-fill Dam
Dam Height [m]: 170
Length of Dam [m]:
Storage Volume of Reservoir (m³):
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€):
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown: