Difference between revisions of "SPIS Set Up"

From energypedia
***** (***** | *****)
***** (***** | *****)
m
Tag: 2017 source edit
 
(20 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
+
<div class="grid stretch-items"> <!-- Row1-->
{{SPIS Set Up}}{{Back to SPIS Toolbox}}<br/>
+
<div class="width-1-3">
 
+
{{Arabic Version|Toolbox on SPIS/ar}}
=== '''<span style="color: rgb(135, 150, 55);">Module Aim and Orientation</span>''' ===
+
</div>
 
+
<div class="width-1-3">  
This module summarizes necessary steps for the installation of the Solar Powered Irrigation System. The design of the SPIS and the selection of the technology provider are completed (see '''[[SPIS Design|DESIGN]]''' module). <span class="mw-customtoggle-SPIS3" style="color: blue; font-size: small; font-weight: bold; float: right; display: inline-block;"><span class="mw-customtoggletext">read more</span></span>
+
{{French Version|Toolbox on SPIS/fr}}
<div class="mw-collapsible mw-collapsed" id="mw-customcollapsible-spis3">
 
The installation of an irrigation system requires planning and decision-making by the producer, as the system should be set up according to set preferences and operation requirements. This module contains the relevant process steps to be taken to finally set up the system. In this module it is assumed that the technology provider is not necessarily the service provider for the installation of the SPIS.
 
 
 
In the '''[[SPIS - Get Informed|GET INFORMED]]''' module the individual components of an SPIS, as well as common system configurations are described. For each component there are several alternative technologies that also react differently when designed a particular configuration. The service provider installing the SPIS also finds useful information on its promotion in the '''[[SPIS - Promote + Initiate|PROMOTE & INITIATE]]''' module. During the installation, the principles on sustainable pumping should be adhered to as described in the '''[[SPIS Safeguard Water|SAFEGUARD WATER]]''' module.&nbsp;
 
 
 
The '''[[SPIS Finance|FINANCE]]''' module gives an insight into financing SPIS components and configurations in different ways. One option discussed is to financially support the installers rather than the farmers. Additionally, the estimation of costs and financial viability of an SPIS is treated in the '''[[SPIS Design|DESIGN]]''' module. The next module, '''[[SPIS Maintain|MAINTAIN]]''', is closely linked to this module because it describes important aspects for maintaining the installed infrastructure.<br/>
 
 
</div>
 
</div>
=== '''<span style="color: rgb(135, 150, 55);">Process Steps</span>''' ===
+
<div class="width-1-3">  
 
+
{{Spanish Version|Toolbox on SPIS/es}}
With the signing of a contract or purchase order with a technology provider all decisions concerning the system components have been made. The quotation or offer from the provider should include a system layout plan in which the specific installation requirements are described. The practical installation is often not done by the producer. <span class="mw-customtoggle-SPIS4" style="color: blue; font-size: small; font-weight: bold; float: right; display: inline-block;"><span class="mw-customtoggletext">read more</span></span>
 
<div class="mw-collapsible mw-collapsed" id="mw-customcollapsible-spis4">
 
Instead, a qualified installer is required to assemble and mount the system components as required. A good quality installation lays the foundation for the reliable operation of the SPIS, taking into consideration the specific site conditions. The installation process will require active decision-making by the future user (i.e. the SPIS client or agricultural producer).<br/>
 
 
 
The set up or installation starts with choosing a suitable service provider. Then a detailed planning of the necessary works has to be made. In the installation planning, all requirements of the producer and the installer will be considered. Once the system components are installed, their proper functioning and the system's overall performance have to be tested.
 
 
 
The producer, as the future user of the system, has to follow this process closely to assure that the SPIS is installed according to the agreed planning and also to understand the system’s functionality. Upon completion of the installation, the producer should insist on receiving appropriate documentation of the system and a personal introduction to its operation.<br/>
 
 
</div>
 
</div>
=== '''<span style="color: rgb(135, 150, 55);">Chapters</span>'''<br/> ===
+
</div> <!-- End Row1 -->
  
'''1. [[SPIS Toolbox - Select Suitable Installer|Select a suitable installer]]'''<br/>'''2. [[SPIS Toolbox - Plan Preparation and Installation|Plan site preparation and installation]]'''<br/>'''3. [[SPIS Toolbox - Install|Install]]'''<br/>'''4. [[SPIS Toolbox - Acceptance Test PVP|Acceptance test PVP]]'''<br/>'''5. [[SPIS Toolbox - System Test|System test]]'''<br/>'''6. [[SPIS Toolbox - Documentation|Documentation]]'''<br/>'''7. [[SPIS Toolbox - Hand-over and Training|Hand-over and user training]]'''<br/>
+
{{SPIS Set Up}} <!-- This banner contains Row 2 -->
 +
{{Back to SPIS Toolbox}}
 +
{{Set Up Text}}
 +
{{SPIS Magic Words}}
  
=== '''<span style="color: rgb(135, 150, 55);">Tools</span>'''<br/> ===
+
[[Category:SPIS_Toolbox]]
 
 
*'''[[:File:SET UP – PVP Acceptance Test.docx|SET UP – PVP Acceptance Test]]'''
 
*'''[[:file:SET UP – Workmanship Quality Checklist.xlsx|SET UP – Workmanship Quality Checklist]]'''
 
 
 
<br/>
 
 
 
{| style="width: 100%;" border="0" cellspacing="1" cellpadding="1"
 
|-
 
| style="background-color: rgb(225, 229, 205);" |
 
*'''[[SPIS Toolbox - Set Up - Further Readings|Further reading, links and tools]]'''
 
*'''[[SPIS Toolbox Glossary|Glossary]]'''
 
*'''[[SPIS Toolbox - Abbreviations|Abbreviations]]'''
 
 
 
|}
 
 
 
<br/>
 
 
 
{| style="width: 100%;" border="0" cellspacing="1" cellpadding="1"
 
|-
 
| style="background-color: rgb(232, 232, 232);" | '''[https://energypedia.info/images/4/4b/Set_Up_Module.pdf ►Click here to download the entire module]'''
 
|}
 
 
 
{{SPIS Magic Words}}
 

Latest revision as of 14:52, 6 December 2021


Module Aim and Orientation

This module summarizes necessary steps for the installation of the Solar Powered Irrigation System. The design of the SPIS and the selection of the technology provider are completed (see DESIGN module). read more

The installation of an irrigation system requires planning and decision-making by the producer, as the system should be set up according to set preferences and operation requirements. This module contains the relevant process steps to be taken to finally set up the system. In this module it is assumed that the technology provider is not necessarily the service provider for the installation of the SPIS.

Process Steps

With the signing of a contract or purchase order with a technology provider all decisions concerning the system components have been made. The quotation or offer from the provider should include a system layout plan in which the specific installation requirements are described. The practical installation is often not done by the producer. read more

Instead, a qualified installer is required to assemble and mount the system components as required. A good quality installation lays the foundation for the reliable operation of the SPIS, taking into consideration the specific site conditions. The installation process will require active decision-making by the future user (i.e. the SPIS client or agricultural producer).

The set up or installation starts with choosing a suitable service provider. Then a detailed planning of the necessary works has to be made. In the installation planning, all requirements of the producer and the installer will be considered. Once the system components are installed, their proper functioning and the systems overall performance have to be tested.

The producer, as the future user of the system, has to follow this process closely to assure that the SPIS is installed according to the agreed planning and also to understand the system’s functionality. Upon completion of the installation, the producer should insist on receiving appropriate documentation of the system and a personal introduction to its operation.

Chapters

1. Select a suitable installer
2. Plan site preparation and installation
3. Install
4. Acceptance test PVP
5. System test
6. Documentation
7. Hand-over and user training

Supplementary Tools



Downloadable Posters

GIZ POSTER 3 English Final.pdf
GIZ POSTER 3 FRENCH.pdf
GIZ POSTER 3 KISWAHILI.pdf


Further Readings