Difference between revisions of "SPIS Toolbox - Set Up - Further Readings"
***** (***** | *****) m |
***** (***** | *****) m |
||
Line 1: | Line 1: | ||
+ | |||
{{SPIS Banner}} | {{SPIS Banner}} | ||
Line 14: | Line 15: | ||
===== '''SPIS tools''' ===== | ===== '''SPIS tools''' ===== | ||
− | + | '''[[:File:SET_UP_01-PVP_Acceptance_Test.docx|SET UP 01-PV Acceptance Test:]]''' | |
− | + | '''[[:File:SET_UP_02-Workmanship_Quality_Checklist.xlsx|SET UP 02-Workmanship Quality Checklist:]]''' | |
− | | + | ''' ''' |
The following tools that are assigned to other Modules are also relevant: | The following tools that are assigned to other Modules are also relevant: | ||
− | + | '''[[:File:PROMOTE_01-SPIS_Rapid_Assessment.docx|PROMOTE 01- SPIS Rapid Assessment:]]''' on the analysis of the market for service provision | |
− | *'''DESIGN 03 | + | *'''[[:File:DESIGN_03-Pump_Sizing_Tool.xlsx|DESIGN 03- Pump Sizing Tool:]]''' to verify SPIS acceptance testing |
− | *'''MAINTAIN 03- | + | *'''MAINTAIN 03- Water application uniformity test:''' that should be implemented directly after setting up the system |
{{SPIS Reference}} | {{SPIS Reference}} |
Revision as of 11:12, 9 June 2017
Introduction
The Toolbox on Solar Powered Irrigation Systems (SPIS) is designed to enable advisors, service providers and practitioners in the field of solar irrigation to provide broad hands-on guidance to end-users, policy-makers and financiers. Risks related to system efficiency, financial viability and the unsustainable use of water resources can thus be minimized. The Toolbox comprises informative modules supplemented with user-friendly software tools (calculations sheets, checklists, guidelines). read more
Modules and tools touch upon:
- assessing the water requirements,
- comparing the financial viability,
- determining farm profitability and payback of investment in SPIS,
- sustainably design and maintain a SPIS,
- highlight critical workmanship quality aspects,
- and many more.
Further Reading, Links and Tools
Links
- “IRRIG8QUICK Irrigation Calibration Quick Test - Guidelines for Drip Micro Irrigation” by Page Blomer Associates (2009) at: www.claw.net.nz/resources/irrigation (08/13/2015)
- “Solar-Powered Irrigation Systems – Stocktaking and Analysis Report” by German Technical Cooperation Agency (GIZ) (2015)
- Schultz and Suryani, 2015. EnDev Indonesia: Inspection Guide for Photovoltaic Village Power (PVVP) Systems. GIZ
SPIS tools
SET UP 01-PV Acceptance Test: SET UP 02-Workmanship Quality Checklist:
The following tools that are assigned to other Modules are also relevant:
PROMOTE 01- SPIS Rapid Assessment: on the analysis of the market for service provision
- DESIGN 03- Pump Sizing Tool: to verify SPIS acceptance testing
- MAINTAIN 03- Water application uniformity test: that should be implemented directly after setting up the system