Knowledge fuels change - Support energypedia!
For over 10 years, energypedia has been connecting energy experts around the world — helping them share knowledge, learn from each other, and accelerate the global energy transition.
Today, we ask for your support to keep this platform free and accessible to all. Even a small contribution makes a big difference! If just 10–20% of our 60,000+ monthly visitors donated the equivalent of a cup of coffee — €5 — Energypedia would be fully funded for a whole year.
Is the knowledge you’ve gained through Energypedia this year worth €5 or more?
Your donation keeps the platform running, helps us create new knowledge products, and contributes directly to achieving SDG 7.


Donate now and support open access to energy expertise

Thank you for your support, your donation, big or small, truly matters!

Difference between revisions of "Fierza"

From energypedia
***** (***** | *****)
(Created page with "{{HPDB |HPDBCountry=Albania |HPDBCity/Town=Bajram Curri, Shkoder, |HPDBCoordinates=Latitude= 42.25139, Longitude= 20.04306 |HPDBDate of Commission=1978 |HPDBStream Name=Drin Riv...")
 
***** (***** | *****)
Line 3: Line 3:
 
|HPDBCity/Town=Bajram Curri, Shkoder,
 
|HPDBCity/Town=Bajram Curri, Shkoder,
 
|HPDBCoordinates=Latitude= 42.25139, Longitude= 20.04306
 
|HPDBCoordinates=Latitude= 42.25139, Longitude= 20.04306
|HPDBDate of Commission=1978  
+
|HPDBDate of Commission=1978
 
|HPDBStream Name=Drin River
 
|HPDBStream Name=Drin River
 
|HPDBOperator=Korporata Elektroenergjitike Shqiptare (KESH).
 
|HPDBOperator=Korporata Elektroenergjitike Shqiptare (KESH).
 +
|HPDBProject Status=Completed
 
|HPDBPower=500000
 
|HPDBPower=500000
 
|HPDBTurbine Type=Fracis turbines
 
|HPDBTurbine Type=Fracis turbines
Line 13: Line 14:
 
|HPDBCommentGI=Connected to national grid via 220kV lines
 
|HPDBCommentGI=Connected to national grid via 220kV lines
 
|HPDBDam Type=Dam on river with reservoir
 
|HPDBDam Type=Dam on river with reservoir
|HPDBDam Construction Material=Rock-fill Dam  
+
|HPDBDam Construction Material=Rock-fill Dam
 
|HPDBDam Height=170
 
|HPDBDam Height=170
 
}}
 
}}

Revision as of 11:50, 31 July 2012


Back to the Hydropower Sites Database

General Information

Country: Albania
City/Town: Bajram Curri, Shkoder,
Coordinates (Powerhouse): The following coordinate was not recognized: Latitude= 42.25139, Longitude= 20.04306.The following coordinate was not recognized: Latitude= 42.25139, Longitude= 20.04306.
Year of Commission: 1978
Basin Name:
Stream Name: Drin River
Developer:
Operator: Korporata Elektroenergjitike Shqiptare (KESH).
Project Status: Completed
Any other uses of the water source:
Contact:
Comment:
Link to Photos:

Technical Information

Power: (kW) 500000
Energy (kWh/a):
Capacity Factor (%):
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type: Fracis turbines
Turbine Manufacturer: Sulzer
Generator Type:
Generator Capacity (kW):
Generator Manufacturer: Dongfang
Comment:

Mini/Island Grid Information

Mini Grid: No
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment: Connected to national grid via 220kV lines

Dam Information

Dam Type:

Dam on river with reservoir
Dam Construction Material: Rock-fill Dam
Dam Height [m]: 170
Length of Dam [m]:
Storage Volume of Reservoir (m³):
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€):
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown: