Difference between revisions of "TUEWAS Toolbox - Connection Agreement Solutions"

From energypedia
***** (***** | *****)
(Created page with "► Back to the Main Page <div class="grid"> <div class="width-1-1 box"> == Browse by Theme/Topic == </div> <div class="width-1-1 ca...")
Tag: 2017 source edit
 
***** (***** | *****)
m
Tag: 2017 source edit
Line 27: Line 27:
 
|?TUW journal <!--12-->
 
|?TUW journal <!--12-->
 
|?TUW url <!--13-->
 
|?TUW url <!--13-->
|?TUW abstract <!--14-->
+
|?TUW active mgmt derms <!--14-->
|?TUW comments <!--15-->
+
|?TUW active mgmt monitoring <!--15-->
|?TUW active mgmt derms <!--16-->
+
|?TUW active mgmt control <!--16-->
|?TUW active mgmt monitoring <!--17-->
+
|?TUW active mgmt congestion <!--17-->
|?TUW active mgmt control <!--18-->
+
|?TUW active mgmt forecasting <!--18-->
|?TUW active mgmt congestion <!--19-->
+
|?TUW active mgmt smart <!--19-->
|?TUW active mgmt forecasting <!--20-->
+
|?TUW enabling battery <!--20-->
|?TUW active mgmt smart <!--21-->
+
|?TUW enabling electric <!--21-->
|?TUW enabling battery <!--22-->
+
|?TUW enabling solar <!--22-->
|?TUW enabling electric <!--23-->
+
|?TUW enabling hydro <!--23-->
|?TUW enabling solar <!--24-->
+
|?TUW enabling others <!--24-->
|?TUW enabling hydro <!--25-->
+
|?TUW enabling grids <!--25-->
|?TUW enabling others <!--26-->
+
|?TUW enabling inverter <!--26-->
|?TUW enabling grids <!--27-->
+
|?TUW market vpp <!--27-->
|?TUW enabling inverter <!--28-->
+
|?TUW market demand <!--28-->
|?TUW market vpp <!--29-->
+
|?TUW connection technical <!--29-->
|?TUW market demand <!--30-->
+
|?TUW connection inter <!--30-->
|?TUW connection technical <!--31-->
+
|?TUW connection compliance <!--31-->
|?TUW connection inter <!--32-->
+
|?TUW distribution distribution <!--32-->
|?TUW connection compliance <!--33-->
+
|?TUW distribution grid <!--33-->
|?TUW distribution distribution <!--34-->
+
|?TUW distribution protection <!--34-->
|?TUW distribution grid <!--35-->
+
|?TUW distribution centralised <!--35-->
|?TUW distribution protection <!--36-->
+
|?TUW distribution disaster <!--36-->
|?TUW distribution centralised <!--37-->
+
|?TUW operation asset <!--37-->
|?TUW distribution disaster <!--38-->
+
|?TUW operation maintenance <!--38-->
|?TUW operation asset <!--39-->
+
|?TUW operation health <!--39-->
|?TUW operation maintenance <!--40-->
+
|?TUW operation information <!--40-->
|?TUW operation health <!--41-->
+
|?TUW info inter <!--41-->
|?TUW operation information <!--42-->
+
|?TUW info cyber <!--42-->
|?TUW info inter <!--43-->
+
|?TUW keywords <!--43-->
|?TUW info cyber <!--44-->
 
|?TUW keywords <!--45-->
 
 
|mainlabel=
 
|mainlabel=
 
|link=none
 
|link=none
Line 88: Line 86:
 
|?TUW journal <!--12-->
 
|?TUW journal <!--12-->
 
|?TUW url <!--13-->
 
|?TUW url <!--13-->
|?TUW abstract <!--14-->
+
|?TUW active mgmt derms <!--14-->
|?TUW comments <!--15-->
+
|?TUW active mgmt monitoring <!--15-->
|?TUW active mgmt derms <!--16-->
+
|?TUW active mgmt control <!--16-->
|?TUW active mgmt monitoring <!--17-->
+
|?TUW active mgmt congestion <!--17-->
|?TUW active mgmt control <!--18-->
+
|?TUW active mgmt forecasting <!--18-->
|?TUW active mgmt congestion <!--19-->
+
|?TUW active mgmt smart <!--19-->
|?TUW active mgmt forecasting <!--20-->
+
|?TUW enabling battery <!--20-->
|?TUW active mgmt smart <!--21-->
+
|?TUW enabling electric <!--21-->
|?TUW enabling battery <!--22-->
+
|?TUW enabling solar <!--22-->
|?TUW enabling electric <!--23-->
+
|?TUW enabling hydro <!--23-->
|?TUW enabling solar <!--24-->
+
|?TUW enabling others <!--24-->
|?TUW enabling hydro <!--25-->
+
|?TUW enabling grids <!--25-->
|?TUW enabling others <!--26-->
+
|?TUW enabling inverter <!--26-->
|?TUW enabling grids <!--27-->
+
|?TUW market vpp <!--27-->
|?TUW enabling inverter <!--28-->
+
|?TUW market demand <!--28-->
|?TUW market vpp <!--29-->
+
|?TUW connection technical <!--29-->
|?TUW market demand <!--30-->
+
|?TUW connection inter <!--30-->
|?TUW connection technical <!--31-->
+
|?TUW connection compliance <!--31-->
|?TUW connection inter <!--32-->
+
|?TUW distribution distribution <!--32-->
|?TUW connection compliance <!--33-->
+
|?TUW distribution grid <!--33-->
|?TUW distribution distribution <!--34-->
+
|?TUW distribution protection <!--34-->
|?TUW distribution grid <!--35-->
+
|?TUW distribution centralised <!--35-->
|?TUW distribution protection <!--36-->
+
|?TUW distribution disaster <!--36-->
|?TUW distribution centralised <!--37-->
+
|?TUW operation asset <!--37-->
|?TUW distribution disaster <!--38-->
+
|?TUW operation maintenance <!--38-->
|?TUW operation asset <!--39-->
+
|?TUW operation health <!--39-->
|?TUW operation maintenance <!--40-->
+
|?TUW operation information <!--40-->
|?TUW operation health <!--41-->
+
|?TUW info inter <!--41-->
|?TUW operation information <!--42-->
+
|?TUW info cyber <!--42-->
|?TUW info inter <!--43-->
+
|?TUW keywords <!--43-->
|?TUW info cyber <!--44-->
 
|?TUW keywords <!--45-->
 
 
|mainlabel=
 
|mainlabel=
 
|link=none
 
|link=none
Line 149: Line 145:
 
|?TUW journal <!--12-->
 
|?TUW journal <!--12-->
 
|?TUW url <!--13-->
 
|?TUW url <!--13-->
|?TUW abstract <!--14-->
+
|?TUW active mgmt derms <!--14-->
|?TUW comments <!--15-->
+
|?TUW active mgmt monitoring <!--15-->
|?TUW active mgmt derms <!--16-->
+
|?TUW active mgmt control <!--16-->
|?TUW active mgmt monitoring <!--17-->
+
|?TUW active mgmt congestion <!--17-->
|?TUW active mgmt control <!--18-->
+
|?TUW active mgmt forecasting <!--18-->
|?TUW active mgmt congestion <!--19-->
+
|?TUW active mgmt smart <!--19-->
|?TUW active mgmt forecasting <!--20-->
+
|?TUW enabling battery <!--20-->
|?TUW active mgmt smart <!--21-->
+
|?TUW enabling electric <!--21-->
|?TUW enabling battery <!--22-->
+
|?TUW enabling solar <!--22-->
|?TUW enabling electric <!--23-->
+
|?TUW enabling hydro <!--23-->
|?TUW enabling solar <!--24-->
+
|?TUW enabling others <!--24-->
|?TUW enabling hydro <!--25-->
+
|?TUW enabling grids <!--25-->
|?TUW enabling others <!--26-->
+
|?TUW enabling inverter <!--26-->
|?TUW enabling grids <!--27-->
+
|?TUW market vpp <!--27-->
|?TUW enabling inverter <!--28-->
+
|?TUW market demand <!--28-->
|?TUW market vpp <!--29-->
+
|?TUW connection technical <!--29-->
|?TUW market demand <!--30-->
+
|?TUW connection inter <!--30-->
|?TUW connection technical <!--31-->
+
|?TUW connection compliance <!--31-->
|?TUW connection inter <!--32-->
+
|?TUW distribution distribution <!--32-->
|?TUW connection compliance <!--33-->
+
|?TUW distribution grid <!--33-->
|?TUW distribution distribution <!--34-->
+
|?TUW distribution protection <!--34-->
|?TUW distribution grid <!--35-->
+
|?TUW distribution centralised <!--35-->
|?TUW distribution protection <!--36-->
+
|?TUW distribution disaster <!--36-->
|?TUW distribution centralised <!--37-->
+
|?TUW operation asset <!--37-->
|?TUW distribution disaster <!--38-->
+
|?TUW operation maintenance <!--38-->
|?TUW operation asset <!--39-->
+
|?TUW operation health <!--39-->
|?TUW operation maintenance <!--40-->
+
|?TUW operation information <!--40-->
|?TUW operation health <!--41-->
+
|?TUW info inter <!--41-->
|?TUW operation information <!--42-->
+
|?TUW info cyber <!--42-->
|?TUW info inter <!--43-->
+
|?TUW keywords <!--43-->
|?TUW info cyber <!--44-->
 
|?TUW keywords <!--45-->
 
 
|mainlabel=
 
|mainlabel=
 
|link=none
 
|link=none

Revision as of 12:10, 10 November 2022

► Back to the Main Page

Technical requirements for connection (grid codes, standards)

ID Number Year Title Author Type of Entry Main Category Country Location within Country File Reference project name Journal or conference name URL Active management of distribution grid Enabling distributing technologies Market-based and Tariff-based solutions Connection agreement solutions Distribution planning Operation and maintenance Information exchange
7 2021 Study on Project to Grid and Project to Project Interconnection of Micro Hydro Practical Action Consulting Private Limited Study Report Distribution planning No file uploaded. Renewable Energy for Rural Areas II (RERA-II) project
  • Distributed generation (small hydro)
  • Technical requirements for connection (grid codes, standards)
  • Interconnection application procedures
  • Grid simulation studies
9 2021 Detailed Feasibility Study of Mini/Micro Hydropower Interconnected Mini Grid in Jumla NEA Engineering Company Limited Study Report Distribution planning Jumla No file uploaded. Renewable Energy for Rural Livelihood (RERL)
  • Distributed generation (small hydro)
  • Mini/micro-grids (when interconnected)
  • Technical requirements for connection (grid codes, standards)
  • Interconnection application procedures
  • Grid simulation studies
14 2019 Revision of Grid Code and Distribution Code for facilitating Variable Renewable Energy Integration – Final Report Moeller & Poeller Engineering GmbH; VietnamMW Co., Ltd Study Report Connection agreement solutions No file uploaded. Smart Grids for Renewable Energy and Energy Efficiency
  • Technical requirements for connection (grid codes, standards)
16 2022 Workshop Slides: Grid Integration of Grid-Connected Photovoltaics Renewables Academy (RENAC) AG Training Material Enabling distributed technologies No file uploaded.
  • Forecasting
  • Distributed generation (solar)
  • Inverter-specific aspects
  • Technical requirements for connection (grid codes, standards)
20 2018 International Review of Residential PV Feed-in Management Electric Power Research Institute Study Report Active management of distribution grid No file uploaded. https://aemo.com.au/-/media/Files/Electricity/NEM/DER/2019/Standards-Protocols/EPRI-PV-Feed-in-Management-Report.pdf
  • Control Solutions
  • Distributed generation (solar)
  • Technical requirements for connection (grid codes, standards)
  • Interoperability and communication
  • Cybersecurity
22 2018 Common Smart Inverter 8 Profile 9 IEEE 2030.5 Implementation Guide for Smart Inverters Sunspec Common Smart Inverter Profile Working Group Guidelines Information exchange No file uploaded. SunSpec IEEE 2030.5 Conformance Profiles Work Group https://sunspec.org/wp-content/uploads/2019/08/CSIPImplementationGuidev2.103-15-2018.pdf
  • Monitoring Solutions
  • Control Solutions
  • Technical requirements for connection (grid codes, standards)
  • Interoperability and communication
39 2022 Grid codes for renewable powered systems International Renewable Energy Agency, Energynautics Study Report Connection agreement solutions No file uploaded. https://www.irena.org/publications/2022/Apr/Grid-codes-for-renewable-powered-systems
  • Technical requirements for connection (grid codes, standards)
  • Compliance mechanisms
40 2019 Highlights of IEEE Standard 1547-2018 Narang, David (NREL) Other Connection agreement solutions No file uploaded. https://www.nrel.gov/docs/fy20osti/75436.pdf
  • Technical requirements for connection (grid codes, standards)
41 2019 An Overview of Distributed Energy Resource (DER) Interconnection: Current Practices and Emerging Solutions National Renewable Energy Laboratory Study Report Connection agreement solutions No file uploaded. https://www.nrel.gov/docs/fy19osti/72102.pdf
  • Inverter-specific aspects
  • Technical requirements for connection (grid codes, standards)
  • Interconnection application procedures
  • Grid simulation studies
  • Cybersecurity
42 n/a Rule 21 Interconnection State of California Web Page Connection agreement solutions California No file uploaded. https://www.cpuc.ca.gov/rule21/
  • Technical requirements for connection (grid codes, standards)
  • Interconnection application procedures
45 2020 PV Generation Hosting Capacity in Dominican Distribution Grids Energynautics Study Report Distribution planning No file uploaded. https://transicionenergetica.do/2021/07/29/pv-generation-hosting-capacity-in-dominican-distribution-grids-full-study-available-in-english-now/
  • Control Solutions
  • Technical requirements for connection (grid codes, standards)
  • Interconnection application procedures
  • Grid simulation studies
  • Protection coordination and adjustments
46 2017 Do It Locally: Local Voltage Support by Distributed Generation – A Management Summary Fraunhofer IWES Study Report Distribution planning No file uploaded. IEA Task 14 Subtask 2 https://iea-pvps.org/wp-content/uploads/2020/01/Task_14_Report__Do_It_Locally_IEA_Final_T14.08.pdf
  • Control Solutions
  • Technical requirements for connection (grid codes, standards)
  • Grid simulation studies
62 2021 Informative Background on the Interoperability Requirements in IEEE Std 1547-2018 Ingram, Michael; Rasel Mahmud; David Narang; NREL Study Report Information exchange No file uploaded. https://www.nrel.gov/docs/fy21osti/77959.pdf
  • Monitoring Solutions
  • Control Solutions
  • Technical requirements for connection (grid codes, standards)
  • Interoperability and communication
88 2017 Simulation of Hawaiian Electric Companies Feeder Operations with Advanced Inverters and Analysis of Annual Photovoltaic Energy Curtailment National Renewable Energy Laboratory Study Report Enabling distributed technologies Hawaii No file uploaded. Task No. WRHV.1000 https://www.nrel.gov/docs/fy17osti/68681.pdf
  • Distributed generation (solar)
  • Inverter-specific aspects
  • Technical requirements for connection (grid codes, standards)
  • Grid simulation studies

►Go to Top

Interconnection application procedures

ID Number Year Title Author Type of Entry Main Category Country Location within Country File Reference project name Journal or conference name URL Active management of distribution grid Enabling distributing technologies Market-based and Tariff-based solutions Connection agreement solutions Distribution planning Operation and maintenance Information exchange
7 2021 Study on Project to Grid and Project to Project Interconnection of Micro Hydro Practical Action Consulting Private Limited Study Report Distribution planning No file uploaded. Renewable Energy for Rural Areas II (RERA-II) project
  • Distributed generation (small hydro)
  • Technical requirements for connection (grid codes, standards)
  • Interconnection application procedures
  • Grid simulation studies
9 2021 Detailed Feasibility Study of Mini/Micro Hydropower Interconnected Mini Grid in Jumla NEA Engineering Company Limited Study Report Distribution planning Jumla No file uploaded. Renewable Energy for Rural Livelihood (RERL)
  • Distributed generation (small hydro)
  • Mini/micro-grids (when interconnected)
  • Technical requirements for connection (grid codes, standards)
  • Interconnection application procedures
  • Grid simulation studies
41 2019 An Overview of Distributed Energy Resource (DER) Interconnection: Current Practices and Emerging Solutions National Renewable Energy Laboratory Study Report Connection agreement solutions No file uploaded. https://www.nrel.gov/docs/fy19osti/72102.pdf
  • Inverter-specific aspects
  • Technical requirements for connection (grid codes, standards)
  • Interconnection application procedures
  • Grid simulation studies
  • Cybersecurity
42 n/a Rule 21 Interconnection State of California Web Page Connection agreement solutions California No file uploaded. https://www.cpuc.ca.gov/rule21/
  • Technical requirements for connection (grid codes, standards)
  • Interconnection application procedures
45 2020 PV Generation Hosting Capacity in Dominican Distribution Grids Energynautics Study Report Distribution planning No file uploaded. https://transicionenergetica.do/2021/07/29/pv-generation-hosting-capacity-in-dominican-distribution-grids-full-study-available-in-english-now/
  • Control Solutions
  • Technical requirements for connection (grid codes, standards)
  • Interconnection application procedures
  • Grid simulation studies
  • Protection coordination and adjustments
49 2017 Optimizing the Grid: Regulator’s Guide to Hosting Capacity Analyses Interstate Renewable Energy Council Guidelines Distribution planning No file uploaded. https://irecusa.org/resources/optimizing-the-grid-regulators-guide-to-hosting-capacity-analyses/
  • Battery Energy Storage Systems
  • Distributed generation (solar)
  • Interconnection application procedures
  • Grid simulation studies

►Go to Top

Compliance mechanisms

ID Number Year Title Author Type of Entry Main Category Country Location within Country File Reference project name Journal or conference name URL Active management of distribution grid Enabling distributing technologies Market-based and Tariff-based solutions Connection agreement solutions Distribution planning Operation and maintenance Information exchange
39 2022 Grid codes for renewable powered systems International Renewable Energy Agency, Energynautics Study Report Connection agreement solutions No file uploaded. https://www.irena.org/publications/2022/Apr/Grid-codes-for-renewable-powered-systems
  • Technical requirements for connection (grid codes, standards)
  • Compliance mechanisms
43 2021 Introduction to the Compliance Process NG Electricity System Operator Guidelines Connection agreement solutions No file uploaded. https://www.nationalgrideso.com/document/190686/download
  • Compliance mechanisms
83 n/a Small-scale Renewable Energy Scheme inspections Clean Energy Regulator of Australia Web Page Connection agreement solutions No file uploaded. https://www.cleanenergyregulator.gov.au/RET/Scheme-participants-and-industry/Agents-and-installers/Small-scale-Renewable-Energy-Scheme-inspections#Smallscale-Renewable-Energy-Scheme-inspection-results
  • Distributed generation (solar)
  • Distributed generation (small hydro)
  • Distributed generation (others)
  • Compliance mechanisms

►Go to Top