Difference between revisions of "Fierza"

From energypedia
***** (***** | *****)
***** (***** | *****)
m
 
Line 2: Line 2:
 
|HPDBCountry=Albania
 
|HPDBCountry=Albania
 
|HPDBCity/Town=Bajram Curri, Shkoder,
 
|HPDBCity/Town=Bajram Curri, Shkoder,
|HPDBCoordinates=Latitude= 42.25139, Longitude= 20.04306
+
|HPDBCoordinates=42.25139, 20.04306
 
|HPDBDate of Commission=1978
 
|HPDBDate of Commission=1978
 
|HPDBStream Name=Drin River
 
|HPDBStream Name=Drin River

Latest revision as of 08:05, 3 September 2012


Back to the Hydropower Sites Database

General Information

Country: Albania
City/Town: Bajram Curri, Shkoder,
Coordinates (Powerhouse): 42° 15' 5.00" N, 20° 2' 35.02" E
Year of Commission: 1978
Basin Name:
Stream Name: Drin River
Developer:
Operator: Korporata Elektroenergjitike Shqiptare (KESH).
Project Status: Completed
Any other uses of the water source:
Contact:
Comment:
Link to Photos:

Technical Information

Power: (kW) 500000
Energy (kWh/a):
Capacity Factor (%):
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type: Fracis turbines
Turbine Manufacturer: Sulzer
Generator Type:
Generator Capacity (kW):
Generator Manufacturer: Dongfang
Comment:

Mini/Island Grid Information

Mini Grid: No
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment: Connected to national grid via 220kV lines

Dam Information

Dam Type:

Dam on river with reservoir
Dam Construction Material: Rock-fill Dam
Dam Height [m]: 170
Length of Dam [m]:
Storage Volume of Reservoir (m³):
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€):
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown: