Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Bush-to-Electricity in Namibia"

From energypedia
***** (***** | *****)
***** (***** | *****)
m
 
Line 1: Line 1:
 
 
= Overview =
 
= Overview =
  
Line 16: Line 15:
 
<br/>
 
<br/>
  
NamPower is currently conducting a feasibility study for the construction and operation of several decentralised biomass power plants with a combined capacity of 60 MW. Study results and an investment decision are expected in the last quarter of 2017.<ref>Economist Namibia - NamPower plans for biomass power plantsfckLRhttps://www.google.com/search?q=economist+namibia+nampower+bush&ie=utf-8&oe=utf-8&client=firefox-b-ab</ref>
+
NamPower is currently conducting a feasibility study for the construction and operation of several decentralised biomass power plants with a combined capacity of 60 MW. Study results and an investment decision are expected in the last quarter of 2017.<ref>Economist Namibia - NamPower plans for biomass power plants https://www.google.com/search?q=economist+namibia+nampower+bush&ie=utf-8&oe=utf-8&client=firefox-b-ab</ref>
  
 
<br/>
 
<br/>
Line 32: Line 31:
 
<references />
 
<references />
  
 +
[[Category:Grid]]
 +
[[Category:Bioenergy]]
 +
[[Category:Namibia]]
 +
[[Category:Publication]]
 
[[Category:Electricity]]
 
[[Category:Electricity]]
[[Category:Publication]]
 
[[Category:Namibia]]
 
[[Category:Bioenergy]]
 
[[Category:Grid]]
 

Latest revision as of 11:30, 30 June 2017

Overview

The national power utility of Namibia, NamPower, is currently exploring options of utilizing encroacher bush (an estimated renewable resource of currently 200-300 mio tonnes) for power production.


Study on Namibian Biomass Processing for Energy Production

A study conducted in 2013 has shown positive results, confirming the general feasibility of biomass to electricity projects in the country (STEAG 2013).[1] To access the publication, click here


A pre-feasibility study for a biomass power plant has been conducted for NamPower. It can be accessed on the utility's website.


NamPower is currently conducting a feasibility study for the construction and operation of several decentralised biomass power plants with a combined capacity of 60 MW. Study results and an investment decision are expected in the last quarter of 2017.[2]


Further Information



References

  1. STEAG (2013), Study on Namibian Biomass Processing for Energy Production, Windhoek
  2. Economist Namibia - NamPower plans for biomass power plants https://www.google.com/search?q=economist+namibia+nampower+bush&ie=utf-8&oe=utf-8&client=firefox-b-ab