Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Fierza"

From energypedia
***** (***** | *****)
(Created page with "{{HPDB |HPDBCountry=Albania |HPDBCity/Town=Bajram Curri, Shkoder, |HPDBCoordinates=Latitude= 42.25139, Longitude= 20.04306 |HPDBDate of Commission=1978 |HPDBStream Name=Drin Riv...")
 
***** (***** | *****)
m
 
(One intermediate revision by one other user not shown)
Line 2: Line 2:
 
|HPDBCountry=Albania
 
|HPDBCountry=Albania
 
|HPDBCity/Town=Bajram Curri, Shkoder,
 
|HPDBCity/Town=Bajram Curri, Shkoder,
|HPDBCoordinates=Latitude= 42.25139, Longitude= 20.04306
+
|HPDBCoordinates=42.25139, 20.04306
|HPDBDate of Commission=1978  
+
|HPDBDate of Commission=1978
 
|HPDBStream Name=Drin River
 
|HPDBStream Name=Drin River
 
|HPDBOperator=Korporata Elektroenergjitike Shqiptare (KESH).
 
|HPDBOperator=Korporata Elektroenergjitike Shqiptare (KESH).
 +
|HPDBProject Status=Completed
 
|HPDBPower=500000
 
|HPDBPower=500000
 
|HPDBTurbine Type=Fracis turbines
 
|HPDBTurbine Type=Fracis turbines
Line 13: Line 14:
 
|HPDBCommentGI=Connected to national grid via 220kV lines
 
|HPDBCommentGI=Connected to national grid via 220kV lines
 
|HPDBDam Type=Dam on river with reservoir
 
|HPDBDam Type=Dam on river with reservoir
|HPDBDam Construction Material=Rock-fill Dam  
+
|HPDBDam Construction Material=Rock-fill Dam
 
|HPDBDam Height=170
 
|HPDBDam Height=170
 
}}
 
}}

Latest revision as of 08:05, 3 September 2012


Back to the Hydropower Sites Database

General Information

Country: Albania
City/Town: Bajram Curri, Shkoder,
Coordinates (Powerhouse): 42° 15' 5.00" N, 20° 2' 35.02" E
Year of Commission: 1978
Basin Name:
Stream Name: Drin River
Developer:
Operator: Korporata Elektroenergjitike Shqiptare (KESH).
Project Status: Completed
Any other uses of the water source:
Contact:
Comment:
Link to Photos:

Technical Information

Power: (kW) 500000
Energy (kWh/a):
Capacity Factor (%):
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type: Fracis turbines
Turbine Manufacturer: Sulzer
Generator Type:
Generator Capacity (kW):
Generator Manufacturer: Dongfang
Comment:

Mini/Island Grid Information

Mini Grid: No
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment: Connected to national grid via 220kV lines

Dam Information

Dam Type:

Dam on river with reservoir
Dam Construction Material: Rock-fill Dam
Dam Height [m]: 170
Length of Dam [m]:
Storage Volume of Reservoir (m³):
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€):
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown: