Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "The Energy Centre Model - An Approach to Village Scale Energy Supply"

From energypedia
***** (***** | *****)
***** (***** | *****)
m
 
(5 intermediate revisions by 2 users not shown)
Line 25: Line 25:
 
<span style="line-height: 20.400001525878906px;"></span>
 
<span style="line-height: 20.400001525878906px;"></span>
  
| [[File:Nextek Power Systems - The Evolution of Distributed Electrical Power.pdf|border|right|250px|File:Nextek Power Systems - The Evolution of Distributed Electrical Power.pdf|alt=File:Experience from First Solar Mini Grid Service in Bangladesh.pdf]]
+
| [[File:The Energy Centre Model - An Approach to Village Scale Energy Supply.pdf|border|right|300px|The Energy Centre Model - An Approach to Village Scale Energy Supply.pdf|alt=File:Experience from First Solar Mini Grid Service in Bangladesh.pdf]]
 
|}
 
|}
 +
 +
<br/>
 +
 +
== Issues Presented ==
 +
 +
<span style="color: rgb(139, 45, 45); font-size: 12px; line-height: 21px;">​​► </span><span style="font-size: 12px; line-height: 21px;">[[:File:The Energy Centre Model - An Approach to Village Scale Energy Supply.pdf|Please see the presentation.]]</span>
 +
*Rural regions, 80% 0f population lives on 20% of the land
 +
**The converse of this is that 20% of the project is on 80% of the land
 +
**This means low population density
 +
*Mini-grid is not a viable model
 +
**There are simply not the numbers of people
 +
**Thus a 2kW system was decided upon- Charging station of sorts
 +
*Issue was how to figure out how to transfer ownership after the payback period
 +
**Incorporated a Community Based Org (CBO)
 +
**They got some community buy in, by charging a fee to become a member
 +
**Institutional and Operations Framework: They had a bookkeeper, Technician,IT manager (for photocopying, computers, etc.)
 +
**The organization in charge was community based
 +
**They were charged with managing. If they did poorly, they were required to surrender the system and give it to someone else
 +
*Results:
 +
**Initially, things were slow
 +
**People felt cheated for not being able to exploit full charge
 +
**The issue was explained--the deal with saving the batteries--and translated into more user-ship
 +
**Some services were being subsidized by other<br/>
 +
 +
<br/>
 +
 +
== Q & A ==
 +
 +
1. What is the IRR for sharing with investors?<br/>
 +
*This is not the approach that was used.
 +
 +
2. Is there any interest in creating a cell phone specific application?<br/>
 +
*No. The cost, even for a simple SHS system is cost restrictive.<br/>
  
 
<br/>
 
<br/>
Line 32: Line 65:
 
= References<br/> =
 
= References<br/> =
  
<references /><br/>
+
<references /><br/>__NOEDITSECTION__
 
+
__NOTOC__
__NOEDITSECTION__
+
__NOTITLE__
  
 
[[Category:Conference_Documentation]]
 
[[Category:Conference_Documentation]]
 
[[Category:Solar]]
 
[[Category:Solar]]

Latest revision as of 12:42, 8 May 2014

Innovating Energy Access for Remote Areas: Discovering Untapped Resources
About the International DAAD-Alumni Summer School, Sustainable Provision of Rural RE
Programme
Participants Presentations
Speaker Presentations


The Energy Centre Model - An Approach to Village Scale Energy Supply

Presenter: Charles Muchunku, (Camco Advisory Services (K) Ltd, Kenya)


Overview

A model for off-grid, village scale power supply has been developed through the Solar Transitions research project, led by the University of Oslo. Through a participatory approach the project developed an energy centre model which became operational on March 20th, 2012. The model creates affordable and accessible basic lighting and electricity services for off-grid households and businesses through a financially sustainable design. It is designed to be operated by local residents on commercial principles. Today, it provides lighting and other services to about 150 households. The paper describes and rationalizes the model and shares experiences from the first 1½ years of operation. The financial performance is documented and suggestions are provided on how the model could be improved[1].

File:Experience from First Solar Mini Grid Service in Bangladesh.pdf


Issues Presented

​​► Please see the presentation.

  • Rural regions, 80% 0f population lives on 20% of the land
    • The converse of this is that 20% of the project is on 80% of the land
    • This means low population density
  • Mini-grid is not a viable model
    • There are simply not the numbers of people
    • Thus a 2kW system was decided upon- Charging station of sorts
  • Issue was how to figure out how to transfer ownership after the payback period
    • Incorporated a Community Based Org (CBO)
    • They got some community buy in, by charging a fee to become a member
    • Institutional and Operations Framework: They had a bookkeeper, Technician,IT manager (for photocopying, computers, etc.)
    • The organization in charge was community based
    • They were charged with managing. If they did poorly, they were required to surrender the system and give it to someone else
  • Results:
    • Initially, things were slow
    • People felt cheated for not being able to exploit full charge
    • The issue was explained--the deal with saving the batteries--and translated into more user-ship
    • Some services were being subsidized by other


Q & A

1. What is the IRR for sharing with investors?

  • This is not the approach that was used.

2. Is there any interest in creating a cell phone specific application?

  • No. The cost, even for a simple SHS system is cost restrictive.


References

  1. The Energy Centre Model - An Approach to Village Scale Energy Supply. Charles Muchunku and Kirsten Ulsrud)